Campus directory

Every tracked data center campus

All 87 data center campuses of 100 MW or more in the US and Canada that the index tracks, grouped by state and province, with links to a profile of each. Figures are index estimates as of November 3, 2026.

Campuses87100 MW or more
Announced205 GWAt full buildout
Expected by 203055 GWWeighted by build stage
Gas burn5.1 Bcf/dAverage day

Jump to: Alaska · Arizona · Georgia · Illinois · Indiana · Kansas · Kentucky · Louisiana · Michigan · Missouri · Nebraska · Nevada · New Mexico · North Dakota · Ohio · Oklahoma · Pennsylvania · Tennessee · Texas · Utah · Virginia · West Virginia · Wisconsin · Wyoming · Alberta

Alaska 1 campus · 270 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Stak Energy North SlopeStak Energy · DC-034North Slope, AKAlaskaProposed3,000270Not disclosed31.7GridD

Arizona 2 campuses · 513 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Tract Buckeye Tech CorridorTract · DC-053Buckeye, AZWest: Desert SouthwestAnnounced1,800378Not disclosed29.6GridC
Hassayampa Ranch Data CenterArizona Land Consulting · DC-064Tonopah, AZWest: Desert SouthwestProposed1,500135Not disclosed10.6GridD

Georgia 3 campuses · 1,582 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
OpenAI Project CamelliaOpenAI · DC-033Effingham County, GASoutheast utilitiesApproved3,210626Grid (Georgia Power)61.2GridB
Microsoft Fairwater AtlantaMicrosoft · DC-009Fayetteville, GASoutheast utilitiesOperating, expanding636572Grid55.9GridC
Project BunkhouseTaurus / Digital Realty · DC-052Stilesboro, GASoutheast utilitiesAnnounced1,830384Not disclosed37.6GridC

Illinois 3 campuses · 786 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Joliet Technology CenterHillwood / PowerHouse · DC-054Joliet, ILPJMAnnounced1,800378Not disclosed29.6GridC
Project CardinalPioneer Development · DC-055Yorkville, ILPJMAnnounced1,800378Not disclosed29.6GridC
TerraWatt Alton (former Alton Steel)TerraWatt · DC-086Alton (Madison County), ILMISOProposed20030Not disclosed2.3GridC

Indiana 5 campuses · 4,103 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Amazon Project RainierAmazon (for Anthropic) · DC-038New Carlisle, INPJMOperating, expanding2,2001,188Grid92.9GridC
AWS Northern Indiana (Hobart)Amazon · DC-037Hobart, INMISOUnder construction2,4001,152Grid90.1GridC
Meta LebanonMeta · DC-077Lebanon, INMISOUnder construction1,000800Not disclosed62.5GridC
Google Project ZodiacGoogle · DC-003Fort Wayne, INPJMOperating, expanding1,200648Grid50.7GridB
Digital Realty Kokomo campusDigital Realty · DC-085Kokomo (Howard County), INMISOAnnounced1,500315Grid (Duke Energy Indiana)24.6GridC

Kansas 1 campus · 420 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Digital Realty Astra Enterprise ParkDigital Realty · DC-046De Soto, KSSPPAnnounced2,000420Not disclosed27.4GridC

Kentucky 2 campuses · 558 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Paducah GDP AI CampusBrookfield / NextEra · DC-056Kevil, KYSoutheast utilitiesAnnounced1,800378Not disclosed36.9GridC
Rubix Project AshlandRubix Data Centers · DC-045Russell, KYPJMProposed2,000180Not disclosed14.1GridD

Louisiana 1 campus · 1,200 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Meta HyperionMeta · DC-027Richland Parish (Holly Ridge), LAMISOUnder construction5,0001,200Grid, dedicated gas plants156.4Grid + gasB

Michigan 2 campuses · 1,012 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Stargate Michigan 'The Barn'Related Digital (OpenAI / Oracle) · DC-072Saline Township, MIMISOUnder construction1,400672Grid (DTE)52.5GridB
Hyperscale Data MichiganHyperscale Data, Inc. · DC-018Dowagiac, MIPJMOperating340340Grid26.6GridD

Missouri 1 campus · 252 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Nebius IndependenceNebius · DC-078Independence, MOSPPAnnounced1,200252Not disclosed16.4GridC

Nebraska 2 campuses · 507 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Stark Hallam HyperscaleStark Power · DC-058Hallam, NESPPAnnounced1,700357Not disclosed23.3GridD
Google / Tenaska SE NebraskaGoogle · DC-081Southeast Nebraska, NESPPProposed1,000150Not disclosed9.8GridD

Nevada 2 campuses · 756 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Tract TRIC Master-Planned ParkTract · DC-047Sparks (Storey County), NVWest: Mountain/NorthwestAnnounced2,000420Not disclosed27.4GridC
Tract Silver Springs ParkTract · DC-060Silver Springs, NVWest: Mountain/NorthwestAnnounced1,600336Not disclosed21.9GridC

New Mexico 3 campuses · 1,479 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Stargate Project JupiterSTACK Infrastructure / BorderPlex Digital Assets · DC-075Santa Teresa (Doña Ana County), NMWest: Desert SouthwestUnder construction2,450941On-site fuel cells (Bloom, gas)114.4GasB
New Era Lea County Data CenterNew Era Energy & Digital · DC-023Lovington, NMSPPProposed7,000315Not disclosed20.5GridD
Roswell Information ParkRoswell Information Park LLC · DC-028Roswell, NMSPPProposed4,960223Not disclosed14.5GridD

North Dakota 1 campus · 700 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Atlas Power WillistonAtlas Power · DC-007Williston, NDSPPOperating700700Grid45.6GridC

Ohio 4 campuses · 4,740 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
PORTS Technology CampusSB Energy / SoftBank (New Day Data Centers) · DC-021Piketon, OHPJMUnder construction10,0002,400Not disclosed187.6Grid + gasC
Meta PrometheusMeta · DC-080New Albany, OHPJMOperating, expanding1,000900Grid + on-site gas82.9Grid + gasB
AWS Project GalaxyAmazon · DC-065Sidney, OHPJMUnder construction1,500720Grid56.3GridC
Stargate LordstownOpenAI / SoftBank / Oracle · DC-066Lordstown, OHPJMUnder construction1,500720Not disclosed56.3GridC

Oklahoma 4 campuses · 1,427 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Core Scientific Muskogee 2Core Scientific · DC-013Muskogee, OKSPPOperating440440Grid28.7GridC
IREN SE Oklahoma CampusIREN · DC-061Clayton, OKSPPAnnounced1,600336Not disclosed21.9GridC
IREN Woods County CampusIREN · DC-062Alva, OKSPPAnnounced1,600336Not disclosed21.9GridC
Cloverleaf Project Open SkyCloverleaf Infrastructure · DC-067Piedmont, OKSPPAnnounced1,500315Not disclosed20.5GridC

Pennsylvania 4 campuses · 3,780 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
TECfusions Keystone ConnectTECfusions · DC-001Upper Burrell, PAPJMOperating, expanding3,0001,620Not disclosed126.7GridD
Aligned Shippingport (Bruce Mansfield)Aligned Data Centers · DC-042Shippingport, PAPJMUnder construction2,000960Not disclosed75.1GridC
Homer City Energy CampusHomer City Redevelopment · DC-029Homer City, PAPJMUnder construction4,500864On-site gas142.6GasB
Wildcat Ridge AI CampusCornell Realty Management · DC-063Archbald, PAPJMAnnounced1,600336Not disclosed26.3GridC

Tennessee 1 campus · 900 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
xAI Colossus 1 + 2xAI · DC-004Memphis / Southaven, TNSoutheast utilitiesOperating, expanding1,000900Grid + on-site gas148.6GasB

Texas 29 campuses · 18,636 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Fermi America Project Matador (HyperGrid)Fermi America · DC-019Amarillo (Carson County), TXSPPUnder construction11,0002,640On-site gas435.8GasD
GW Ranch (Pecos County)Tenant per dcmap: Amazon · DC-024Fort Stockton, TXERCOTUnder construction7,6501,469On-site gas242.4GasC
IREN SweetwaterIREN · DC-048Sweetwater, TXERCOTUnder construction2,000960Grid68.8GridC
Riot Platforms CorsicanaRiot Platforms · DC-005Corsicana, TXERCOTOperating, expanding1,000900Grid64.5GridC
PowerHouse Grand Prairie CampusPowerHouse Data Centers · DC-057Grand Prairie, TXERCOTUnder construction1,800864Not disclosed61.9GridC
Meta El PasoMeta · DC-076El Paso, TXWest: Desert SouthwestUnder construction1,000800Grid + on-site gas82.9Grid + gasC
Galaxy Helios CampusGalaxy Digital · DC-059Afton (Dickens County), TXERCOTUnder construction1,630782Grid56.1GridB
Microsoft Pecos Campus (Project Kilby)Microsoft · DC-043Pecos, TXERCOTApproved2,000780On-site gas (Chevron, 20-year PPA)128.7GasB
IREN ChildressIREN · DC-006Childress, TXERCOTOperating750750Grid53.8GridC
Core Scientific Pecos AI CampusCore Scientific · DC-068Pecos, TXERCOTUnder construction1,500720Not disclosed51.6GridC
Riot Platforms RockdaleRiot Platforms · DC-008Rockdale, TXERCOTOperating700700Grid50.2GridC
Vantage Frontier (Stargate)Vantage Data Centers · DC-071Shackelford County, TXERCOTUnder construction1,400672Grid + on-site gas73.3Grid + gasC
Taylor Technology CampusBig Watt Digital + PowerHouse Data Centers · DC-087Taylor (Williamson County), TXERCOTApproved1,000650On-site gas (behind the meter)107.3GasB
Stargate AbileneCrusoe / Oracle / OpenAI · DC-073Abilene, TXERCOTOperating, expanding1,200648Grid + on-site gas61.0GridB
Stargate Milam County (Project Freebird)SB Energy · DC-074Burlington (Milam County), TXERCOTUnder construction1,200576Not disclosed41.3GridC
Bitdeer TexasBitdeer · DC-010Rockdale, TXERCOTOperating563563Grid40.4GridC
Tesla Cortex 2 (Giga Texas)Tesla · DC-011Austin, TXERCOTOperating, expanding500450Grid32.3GridC
Caldwell County campuses (PowerHouse / Tract)PowerHouse; Tract · DC-031Uhland, TXERCOTAnnounced4,000420Not disclosed30.1GridD
Poolside Project HorizonPoolside AI · DC-049Fort Stockton, TXERCOTAnnounced2,000420Not disclosed30.1GridD
Data Journey The BunkerData Journey · DC-015Montgomery, TXERCOTOperating400400Grid28.7GridD
Core Scientific DentonCore Scientific · DC-016Denton, TXERCOTOperating394394Grid28.2GridC
Galaxy Project Merlin (Helios II)Galaxy Digital · DC-032McGregor, TXERCOTAnnounced3,500368Not disclosed26.3GridD
Compass Red Oak DFW IIICompass Datacenters · DC-017Red Oak, TXERCOTOperating, expanding360324Grid23.2GridC
Crusoe Victoria AI FactoryCrusoe · DC-069Victoria, TXERCOTAnnounced1,500315Not disclosed22.6GridC
CloudBurst San Marcos Data Center ICloudBurst · DC-079San Marcos, TXERCOTAnnounced1,200252Not disclosed18.1GridC
Data City TexasEnergy Abundance Development Corp. · DC-025Laredo, TXERCOTProposed5,000225Not disclosed16.1GridD
Sailfish Comanche CircleSailfish Digital Ventures · DC-026Tolar, TXERCOTProposed5,000225Not disclosed16.1GridD
Amp Energy East TexasAmp Z · DC-041Lufkin, TXERCOTProposed2,100189Not disclosed13.5GridD
Eneus Energy HarlingenEneus Energy · DC-044Harlingen, TXERCOTProposed2,000180Not disclosed12.9GridD

Utah 3 campuses · 3,573 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Creekstone Delta GigasiteCreekstone Energy · DC-020Delta, UTWest: Mountain/NorthwestUnder construction10,0002,400Not disclosed156.4GridC
Joule Energy & Data Center CampusJoule Capital Partners · DC-030Holden (Millard County), UTWest: Mountain/NorthwestUnder construction4,000768On-site gas126.8GasC
Stratos AI Data Center CampusO'Leary Digital · DC-022Lucin, UTWest: Mountain/NorthwestProposed9,000405Not disclosed26.4GridD

Virginia 5 campuses · 3,501 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Amazon Northeast Creek Technology CampusAmazon · DC-035Louisa County, VAPJMUnder construction2,7001,296Grid101.3GridC
Tract Hanover Technology ParkTract · DC-039Ashland, VAPJMApproved2,400936Grid (Dominion)73.2GridB
STACK NVA02STACK Infrastructure · DC-014Bristow, VAPJMOperating420504Grid39.4GridC
TA Realty Leesburg campusTA Realty · DC-012Leesburg, VAPJMOperating450450Grid35.2GridC
AWS Wilderness CrossingAmazon · DC-070Montford (Orange County), VAPJMAnnounced1,500315Not disclosed24.6GridC

West Virginia 3 campuses · 1,313 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Nscale Monarch Compute CampusNscale · DC-051Point Pleasant, WVPJMUnder construction2,000960Not disclosed75.1GridC
Fundamental Data RidgelineFundamental Data · DC-050Hambleton, WVPJMProposed2,000180Not disclosed14.1GridD
Adams Fork Data Center Energy CampusTransGas Development Systems · DC-040Wharncliffe, WVPJMProposed2,400173On-site gas28.5GasD

Wisconsin 1 campus · 799 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Microsoft Fairwater 1Microsoft · DC-002Mount Pleasant, WIMISOOperating, expanding1,480799Grid62.5GridB

Wyoming 1 campus · 1,296 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Google Project TemboGoogle · DC-036Cheyenne, WYWest: Mountain/NorthwestUnder construction2,7001,296Not disclosed84.4GridC

Alberta 3 campuses · 838 MW expected by 2030

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Meta Sturgeon CountyMeta · DC-083Sturgeon County, ABAlberta (AESO)Announced1,000350Dedicated gas plant ($4.6B, Pembina-led)45.6Grid + gasC
Wonder ValleyO'Leary Ventures · DC-082Greenview (MD), ABAlberta (AESO)Proposed7,500338On-site gas55.7GasC
TransAlta Keephills data centreTransAlta · DC-084Keephills (Parkland County), ABAlberta (AESO)Approved230150Grid17.5GridB

Watch list: reported, not yet verified

Not counted in totals until size, status and power supply are confirmed against a primary source.

CandidateLocationLikely grid regionReported sizePower supplySources
Project RomanGoogle (via Intersect Power)Near Hereford (Deaf Smith County), TXSPP (to confirm)Not disclosedSelf-supplied gas plant plus wind and solar; gas via NGPL Amarillo Expansion (550,000 Dth/d)NewsChannel 10 (Amarillo) · Natural Gas Intelligence
Meitner Energy CenterGoogle + Intersect PowerGray and Roberts Counties, TXSPP (to confirm)Not disclosed; over 1 GW of co-located wind, solar and storageRenewables with on-site gas for firmingPV Tech
Google West MemphisGoogleWest Memphis, ARMISO (Entergy Arkansas)Not disclosed; $4B first phaseGrid, with 600 MW solar and 350 MW battery (Cypress Solar)POWER · GuruFocus via Yahoo Finance

Dropped after review: Synapse's Olds, Alberta campus (the Alberta Utilities Commission rejected its 1.4 GW gas plant in August 2026). See the change log.