United States · state

Data centers in Arizona

2 tracked campuses of 100 MW or more in Arizona, on the West: Desert Southwest grid. The largest expected load by 2030 is Tract Buckeye Tech Corridor.

Campuses2100 MW or more
Announced3,300 MWAt full buildout
Expected by 2030513 MWWeighted by build stage
Gas burn40 MMcf/dAverage day

Campuses in Arizona

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Tract Buckeye Tech CorridorTract · DC-053Buckeye, AZWest: Desert SouthwestAnnounced1,800378Not disclosed29.6GridC
Hassayampa Ranch Data CenterArizona Land Consulting · DC-064Tonopah, AZWest: Desert SouthwestProposed1,500135Not disclosed10.6GridD

Expected load and gas burn are index estimates. See the methodology and the source log.