 "name": "Data Center Index",
 "publisher": "Discovery Energy Utility Audits",
 "url": "https://datacenterindex.info/",
 "updated": "2026-11-03",
 "license_note": "Free to cite with credit: Data Center Index (datacenterindex.info), Discovery Energy. See https://datacenterindex.info/disclosures/",
 "notes": "Expected MW, annual GWh, gas burn and ratings are Discovery Energy model outputs. See https://datacenterindex.info/methodology/",
 "totals": {
  "campuses": 87,
  "announced_mw": 204593,
  "expected_mw_2030": 54941,
  "gas_burn_avg_mmcfd": 5096.9
 },
 "campuses": [
  {
   "id": "DC-001",
   "campus": "TECfusions Keystone Connect",
   "developer_or_tenant": "TECfusions",
   "segment": "Developer campus",
   "location": "Upper Burrell, PA",
   "state_code": "PA",
   "state_or_province": "Pennsylvania",
   "country": "United States",
   "metro": "Pittsburgh",
   "grid_region": "PJM",
   "electric_utility": "TBD",
   "status": "Operating, expanding",
   "online_or_target": "",
   "announced_mw": 3000,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 1620,
   "annual_gwh_expected": 10643,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 126.7,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "Published 3,000 MW is likely campus potential; operating load is far lower. Verify before publishing.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-001-tecfusions-keystone-connect/"
  },
  {
   "id": "DC-002",
   "campus": "Microsoft Fairwater 1",
   "developer_or_tenant": "Microsoft",
   "segment": "Hyperscale AI",
   "location": "Mount Pleasant, WI",
   "state_code": "WI",
   "state_or_province": "Wisconsin",
   "country": "United States",
   "metro": "Milwaukee–Racine",
   "grid_region": "MISO",
   "electric_utility": "We Energies",
   "status": "Operating, expanding",
   "online_or_target": "2025–",
   "announced_mw": 1480,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 799,
   "annual_gwh_expected": 5249,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 62.5,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "B",
   "update_note": "",
   "research_note": "dcmap also lists a 338 MW Azure figure for the site; 1,480 MW is the program total.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-002-microsoft-fairwater-1/"
  },
  {
   "id": "DC-003",
   "campus": "Google Project Zodiac",
   "developer_or_tenant": "Google",
   "segment": "Hyperscale",
   "location": "Fort Wayne, IN",
   "state_code": "IN",
   "state_or_province": "Indiana",
   "country": "United States",
   "metro": "Fort Wayne",
   "grid_region": "PJM",
   "electric_utility": "Indiana Michigan Power (AEP)",
   "status": "Operating, expanding",
   "online_or_target": "",
   "announced_mw": 1200,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 648,
   "annual_gwh_expected": 4257,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 50.7,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "B",
   "update_note": "",
   "research_note": "dcmap: 576 MW operating campus; 1,200 MW initial-phase figure used.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-003-google-project-zodiac/"
  },
  {
   "id": "DC-004",
   "campus": "xAI Colossus 1 + 2",
   "developer_or_tenant": "xAI",
   "segment": "Hyperscale AI",
   "location": "Memphis / Southaven, TN",
   "state_code": "TN",
   "state_or_province": "Tennessee",
   "country": "United States",
   "metro": "Memphis",
   "grid_region": "Southeast utilities",
   "electric_utility": "TVA / MLGW + on-site gas",
   "status": "Operating, expanding",
   "online_or_target": "2024–",
   "announced_mw": 1000,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 900,
   "annual_gwh_expected": 5913,
   "power_supply": "Grid + on-site gas",
   "gas_burn_avg_mmcfd": 148.6,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Gas",
   "confidence": "B",
   "update_note": "",
   "research_note": "Cleanview: 1,498 MW of operating gas turbines across both sites (partly mobile). Operating IT load estimates span 250–750 MW. Electricchoice's separate 2 GW Southaven row treated as the same program.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://cleanview.co/reports/behind-the-meter-data-centers"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-004-xai-colossus-1-2/"
  },
  {
   "id": "DC-005",
   "campus": "Riot Platforms Corsicana",
   "developer_or_tenant": "Riot Platforms",
   "segment": "Crypto / HPC",
   "location": "Corsicana, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Dallas–Fort Worth",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Operating, expanding",
   "online_or_target": "",
   "announced_mw": 1000,
   "mw_basis": "Facility / utility service",
   "expected_mw_2030": 900,
   "annual_gwh_expected": 5913,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 64.5,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Bitcoin mining / HPC campus; facility power figure.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-005-riot-platforms-corsicana/"
  },
  {
   "id": "DC-006",
   "campus": "IREN Childress",
   "developer_or_tenant": "IREN",
   "segment": "Crypto / HPC",
   "location": "Childress, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Operating",
   "online_or_target": "",
   "announced_mw": 750,
   "mw_basis": "Facility / utility service",
   "expected_mw_2030": 750,
   "annual_gwh_expected": 4928,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 53.8,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Utility service figure.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-006-iren-childress/"
  },
  {
   "id": "DC-007",
   "campus": "Atlas Power Williston",
   "developer_or_tenant": "Atlas Power",
   "segment": "Crypto / HPC",
   "location": "Williston, ND",
   "state_code": "ND",
   "state_or_province": "North Dakota",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "SPP",
   "electric_utility": "TBD",
   "status": "Operating",
   "online_or_target": "",
   "announced_mw": 700,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 700,
   "annual_gwh_expected": 4599,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 45.6,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Region (SPP vs MISO) to verify.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-007-atlas-power-williston/"
  },
  {
   "id": "DC-008",
   "campus": "Riot Platforms Rockdale",
   "developer_or_tenant": "Riot Platforms",
   "segment": "Crypto / HPC",
   "location": "Rockdale, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Operating",
   "online_or_target": "",
   "announced_mw": 700,
   "mw_basis": "Facility / utility service",
   "expected_mw_2030": 700,
   "annual_gwh_expected": 4599,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 50.2,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-008-riot-platforms-rockdale/"
  },
  {
   "id": "DC-009",
   "campus": "Microsoft Fairwater Atlanta",
   "developer_or_tenant": "Microsoft",
   "segment": "Hyperscale AI",
   "location": "Fayetteville, GA",
   "state_code": "GA",
   "state_or_province": "Georgia",
   "country": "United States",
   "metro": "Atlanta",
   "grid_region": "Southeast utilities",
   "electric_utility": "Georgia Power",
   "status": "Operating, expanding",
   "online_or_target": "",
   "announced_mw": 636,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 572,
   "annual_gwh_expected": 3758,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 55.9,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "dcmap 636 MW (estimated) vs Electricchoice 1.5 GW; lower figure used.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-009-microsoft-fairwater-atlanta/"
  },
  {
   "id": "DC-010",
   "campus": "Bitdeer Texas",
   "developer_or_tenant": "Bitdeer",
   "segment": "Crypto / HPC",
   "location": "Rockdale, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Operating",
   "online_or_target": "",
   "announced_mw": 563,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 563,
   "annual_gwh_expected": 3699,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 40.4,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-010-bitdeer-texas/"
  },
  {
   "id": "DC-011",
   "campus": "Tesla Cortex 2 (Giga Texas)",
   "developer_or_tenant": "Tesla",
   "segment": "Hyperscale AI",
   "location": "Austin, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Austin",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Operating, expanding",
   "online_or_target": "",
   "announced_mw": 500,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 450,
   "annual_gwh_expected": 2956,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 32.3,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Estimated program figure.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-011-tesla-cortex-2-giga-texas/"
  },
  {
   "id": "DC-012",
   "campus": "TA Realty Leesburg campus",
   "developer_or_tenant": "TA Realty",
   "segment": "Colocation",
   "location": "Leesburg, VA",
   "state_code": "VA",
   "state_or_province": "Virginia",
   "country": "United States",
   "metro": "Washington DC",
   "grid_region": "PJM",
   "electric_utility": "Dominion Energy Virginia",
   "status": "Operating",
   "online_or_target": "",
   "announced_mw": 450,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 450,
   "annual_gwh_expected": 2956,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 35.2,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "20335 Celtic Park Drive campus.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-012-ta-realty-leesburg-campus/"
  },
  {
   "id": "DC-013",
   "campus": "Core Scientific Muskogee 2",
   "developer_or_tenant": "Core Scientific",
   "segment": "Crypto / HPC",
   "location": "Muskogee, OK",
   "state_code": "OK",
   "state_or_province": "Oklahoma",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "SPP",
   "electric_utility": "TBD",
   "status": "Operating",
   "online_or_target": "",
   "announced_mw": 440,
   "mw_basis": "Facility / utility service",
   "expected_mw_2030": 440,
   "annual_gwh_expected": 2891,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 28.7,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Estimated.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-013-core-scientific-muskogee-2/"
  },
  {
   "id": "DC-014",
   "campus": "STACK NVA02",
   "developer_or_tenant": "STACK Infrastructure",
   "segment": "Colocation",
   "location": "Bristow, VA",
   "state_code": "VA",
   "state_or_province": "Virginia",
   "country": "United States",
   "metro": "Washington DC",
   "grid_region": "PJM",
   "electric_utility": "TBD",
   "status": "Operating",
   "online_or_target": "",
   "announced_mw": 420,
   "mw_basis": "IT load",
   "expected_mw_2030": 504,
   "annual_gwh_expected": 3311,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 39.4,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Critical IT load figure.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-014-stack-nva02/"
  },
  {
   "id": "DC-015",
   "campus": "Data Journey The Bunker",
   "developer_or_tenant": "Data Journey",
   "segment": "Colocation",
   "location": "Montgomery, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Houston",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Operating",
   "online_or_target": "",
   "announced_mw": 400,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 400,
   "annual_gwh_expected": 2628,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 28.7,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "Estimated.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-015-data-journey-the-bunker/"
  },
  {
   "id": "DC-016",
   "campus": "Core Scientific Denton",
   "developer_or_tenant": "Core Scientific",
   "segment": "Crypto / HPC",
   "location": "Denton, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Dallas–Fort Worth",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Operating",
   "online_or_target": "",
   "announced_mw": 394,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 394,
   "annual_gwh_expected": 2589,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 28.2,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Converted to AI/HPC hosting.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-016-core-scientific-denton/"
  },
  {
   "id": "DC-017",
   "campus": "Compass Red Oak DFW III",
   "developer_or_tenant": "Compass Datacenters",
   "segment": "Colocation",
   "location": "Red Oak, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Dallas–Fort Worth",
   "grid_region": "ERCOT",
   "electric_utility": "Oncor",
   "status": "Operating, expanding",
   "online_or_target": "",
   "announced_mw": 360,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 324,
   "annual_gwh_expected": 2129,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 23.2,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-017-compass-red-oak-dfw-iii/"
  },
  {
   "id": "DC-018",
   "campus": "Hyperscale Data Michigan",
   "developer_or_tenant": "Hyperscale Data, Inc.",
   "segment": "Crypto / HPC",
   "location": "Dowagiac, MI",
   "state_code": "MI",
   "state_or_province": "Michigan",
   "country": "United States",
   "metro": "South Bend",
   "grid_region": "PJM",
   "electric_utility": "TBD",
   "status": "Operating",
   "online_or_target": "",
   "announced_mw": 340,
   "mw_basis": "Facility / utility service",
   "expected_mw_2030": 340,
   "annual_gwh_expected": 2234,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 26.6,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "Site power figure.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-018-hyperscale-data-michigan/"
  },
  {
   "id": "DC-019",
   "campus": "Fermi America Project Matador (HyperGrid)",
   "developer_or_tenant": "Fermi America",
   "segment": "Developer campus",
   "location": "Amarillo (Carson County), TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Amarillo",
   "grid_region": "SPP",
   "electric_utility": "Off-grid / on-site",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 11000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 2640,
   "annual_gwh_expected": 17345,
   "power_supply": "On-site gas",
   "gas_burn_avg_mmcfd": 435.8,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Gas",
   "confidence": "D",
   "update_note": "TensorWave signed a binding 222 MW, $6.5B lease (Aug 2026); closing extended to Oct 31, 2026 pending a guaranty. First tenant had exited in Dec 2025.",
   "research_note": "dcmap cites 17,000 MW; Blackridge/Brightlio up to 11 GW; Electricchoice lists Phase 1 at a 2 GW target. Gas plus planned nuclear.",
   "source_urls": [
    "https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa",
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.abc7amarillo.com/news/local/fermi-america-releases-statement-after-losing-funding-from-first-major-tenant",
    "https://convergedigest.com/fermi-america-resets-timeline-for-project-matador/?amp=1",
    "https://www.newswire.com/news/fermi-and-tensorwave-agree-to-extend-closing-date-to-october-31-2026"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-019-fermi-america-project-matador-hypergrid/"
  },
  {
   "id": "DC-020",
   "campus": "Creekstone Delta Gigasite",
   "developer_or_tenant": "Creekstone Energy",
   "segment": "Developer campus",
   "location": "Delta, UT",
   "state_code": "UT",
   "state_or_province": "Utah",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "West: Mountain/Northwest",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "2027",
   "announced_mw": 10000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 2400,
   "annual_gwh_expected": 15768,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 156.4,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Over 10 GW announced electrical buildout.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.newsweek.com/map-states-biggest-data-centers-being-built-12574267"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-020-creekstone-delta-gigasite/"
  },
  {
   "id": "DC-021",
   "campus": "PORTS Technology Campus",
   "developer_or_tenant": "SB Energy / SoftBank (New Day Data Centers)",
   "segment": "Developer campus",
   "location": "Piketon, OH",
   "state_code": "OH",
   "state_or_province": "Ohio",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "PJM",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 10000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 2400,
   "annual_gwh_expected": 15768,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 187.6,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid + gas",
   "confidence": "C",
   "update_note": "",
   "research_note": "Newsweek/Data Center Index: 8 GW. Electricchoice lists 10 GW and a separate 8 GW 'PORTS-Pike' row; treated as one project. AEP reports about 9 GW of contracted load at Piketon (Q3 2026 call); construction expected to begin Q1 2027.",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/",
    "https://www.newsweek.com/map-states-biggest-data-centers-being-built-12574267",
    "https://www.fool.com/earnings/call-transcripts/2026/10/28/aep-q3-2026-earnings-call-transcript/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-021-ports-technology-campus/"
  },
  {
   "id": "DC-022",
   "campus": "Stratos AI Data Center Campus",
   "developer_or_tenant": "O'Leary Digital",
   "segment": "Developer campus",
   "location": "Lucin, UT",
   "state_code": "UT",
   "state_or_province": "Utah",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "West: Mountain/Northwest",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 9000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 405,
   "annual_gwh_expected": 2661,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 26.4,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-022-stratos-ai-data-center-campus/"
  },
  {
   "id": "DC-023",
   "campus": "New Era Lea County Data Center",
   "developer_or_tenant": "New Era Energy & Digital",
   "segment": "Developer campus",
   "location": "Lovington, NM",
   "state_code": "NM",
   "state_or_province": "New Mexico",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "SPP",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 7000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 315,
   "annual_gwh_expected": 2070,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 20.5,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-023-new-era-lea-county-data-center/"
  },
  {
   "id": "DC-024",
   "campus": "GW Ranch (Pecos County)",
   "developer_or_tenant": "Tenant per dcmap: Amazon",
   "segment": "Developer campus",
   "location": "Fort Stockton, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "Off-grid / on-site",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 7650,
   "mw_basis": "Generation nameplate",
   "expected_mw_2030": 1469,
   "annual_gwh_expected": 9651,
   "power_supply": "On-site gas",
   "gas_burn_avg_mmcfd": 242.4,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Gas",
   "confidence": "C",
   "update_note": "",
   "research_note": "7,650 MW gas generation nameplate. Developer/tenant attribution to verify. Poolside 'Project Horizon' (DC-049) may share this site.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-024-gw-ranch-pecos-county/"
  },
  {
   "id": "DC-025",
   "campus": "Data City Texas",
   "developer_or_tenant": "Energy Abundance Development Corp.",
   "segment": "Developer campus",
   "location": "Laredo, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Laredo",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 5000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 225,
   "annual_gwh_expected": 1478,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 16.1,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-025-data-city-texas/"
  },
  {
   "id": "DC-026",
   "campus": "Sailfish Comanche Circle",
   "developer_or_tenant": "Sailfish Digital Ventures",
   "segment": "Developer campus",
   "location": "Tolar, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Dallas–Fort Worth",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 5000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 225,
   "annual_gwh_expected": 1478,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 16.1,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "dcmap 5 GW; Electricchoice 2 GW.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-026-sailfish-comanche-circle/"
  },
  {
   "id": "DC-027",
   "campus": "Meta Hyperion",
   "developer_or_tenant": "Meta",
   "segment": "Hyperscale AI",
   "location": "Richland Parish (Holly Ridge), LA",
   "state_code": "LA",
   "state_or_province": "Louisiana",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "MISO",
   "electric_utility": "Entergy Louisiana",
   "status": "Under construction",
   "online_or_target": "2028",
   "announced_mw": 5000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 1200,
   "annual_gwh_expected": 7884,
   "power_supply": "Grid, dedicated gas plants",
   "gas_burn_avg_mmcfd": 156.4,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid + gas",
   "confidence": "B",
   "update_note": "Entergy seeks 7 more gas plants (10 in total, about 7.5 GW); Louisiana PSC decision due Dec 2026 (Docket 32728).",
   "research_note": "Entergy building three combined-cycle units (~2.3 GW) for the campus (S&P). Electricchoice lists 2 GW (initial phase).",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://spglobal.com/commodity-insights/en/news-research/latest-news/natural-gas/031425-ceraweek-us-producers-top-regulator-see-gas-winning-resource-competition-to-power-ai",
    "https://www.ucs.org/about/news/louisiana-regulators-fast-track-7-gas-plant-proposal-meta-data-center",
    "https://www.wwno.org/coastal-desk/2026-04-21/advocates-cite-lack-of-transparency-rising-costs-as-regulators-fast-track-second-meta-data-center",
    "https://earthjustice.org/press/2026/advocates-appeal-louisiana-pscs-arbitrary-and-capricious-decision-to-let-meta-off-the-hook-for-its-data-center-project"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-027-meta-hyperion/"
  },
  {
   "id": "DC-028",
   "campus": "Roswell Information Park",
   "developer_or_tenant": "Roswell Information Park LLC",
   "segment": "Developer campus",
   "location": "Roswell, NM",
   "state_code": "NM",
   "state_or_province": "New Mexico",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "SPP",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 4960,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 223,
   "annual_gwh_expected": 1465,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 14.5,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-028-roswell-information-park/"
  },
  {
   "id": "DC-029",
   "campus": "Homer City Energy Campus",
   "developer_or_tenant": "Homer City Redevelopment",
   "segment": "Developer campus",
   "location": "Homer City, PA",
   "state_code": "PA",
   "state_or_province": "Pennsylvania",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "PJM",
   "electric_utility": "On-site",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 4500,
   "mw_basis": "Generation nameplate",
   "expected_mw_2030": 864,
   "annual_gwh_expected": 5676,
   "power_supply": "On-site gas",
   "gas_burn_avg_mmcfd": 142.6,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Gas",
   "confidence": "B",
   "update_note": "",
   "research_note": "4.5 GW gas-fired plant on a former coal site.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.latitudemedia.com/news/is-gas-really-winning-the-ai-race/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-029-homer-city-energy-campus/"
  },
  {
   "id": "DC-030",
   "campus": "Joule Energy & Data Center Campus",
   "developer_or_tenant": "Joule Capital Partners",
   "segment": "Developer campus",
   "location": "Holden (Millard County), UT",
   "state_code": "UT",
   "state_or_province": "Utah",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "West: Mountain/Northwest",
   "electric_utility": "On-site",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 4000,
   "mw_basis": "Generation nameplate",
   "expected_mw_2030": 768,
   "annual_gwh_expected": 5046,
   "power_supply": "On-site gas",
   "gas_burn_avg_mmcfd": 126.8,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Gas",
   "confidence": "C",
   "update_note": "",
   "research_note": "dcmap: 4,000 MW onsite generation. Fuel assumed natural gas; verify.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-030-joule-energy-and-data-center-campus/"
  },
  {
   "id": "DC-031",
   "campus": "Caldwell County campuses (PowerHouse / Tract)",
   "developer_or_tenant": "PowerHouse; Tract",
   "segment": "Developer campus",
   "location": "Uhland, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Austin",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 4000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 420,
   "annual_gwh_expected": 2759,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 30.1,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "Electricchoice lists PowerHouse Caldwell County (4 GW) and Tract Caldwell Valley (2 GW); dcmap lists Tract at 4 GW. Kept as one row pending dedup.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-031-caldwell-county-campuses-powerhouse-tract/"
  },
  {
   "id": "DC-032",
   "campus": "Galaxy Project Merlin (Helios II)",
   "developer_or_tenant": "Galaxy Digital",
   "segment": "Developer campus",
   "location": "McGregor, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Waco",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 3500,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 368,
   "annual_gwh_expected": 2418,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 26.3,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-032-galaxy-project-merlin-helios-ii/"
  },
  {
   "id": "DC-033",
   "campus": "OpenAI Project Camellia",
   "developer_or_tenant": "OpenAI",
   "segment": "Hyperscale AI",
   "location": "Effingham County, GA",
   "state_code": "GA",
   "state_or_province": "Georgia",
   "country": "United States",
   "metro": "Savannah",
   "grid_region": "Southeast utilities",
   "electric_utility": "Georgia Power",
   "status": "Approved",
   "online_or_target": "2028",
   "announced_mw": 3210,
   "mw_basis": "Facility / utility service",
   "expected_mw_2030": 626,
   "annual_gwh_expected": 4113,
   "power_supply": "Grid (Georgia Power)",
   "gas_burn_avg_mmcfd": 61.2,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "B",
   "update_note": "Nov 3, 2026: Georgia Power signed a 3.2 GW, 25-year contract; service from 2028, 1 GW flexible. Status raised from Announced.",
   "research_note": "dcmap: 3,210 MW peak connected load (estimated).",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa",
    "https://utilitydive.com/news/southern-co-contracted-large-load-data-centers/826919"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-033-openai-project-camellia/"
  },
  {
   "id": "DC-034",
   "campus": "Stak Energy North Slope",
   "developer_or_tenant": "Stak Energy",
   "segment": "Developer campus",
   "location": "North Slope, AK",
   "state_code": "AK",
   "state_or_province": "Alaska",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "Alaska",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 3000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 270,
   "annual_gwh_expected": 1774,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 31.7,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-034-stak-energy-north-slope/"
  },
  {
   "id": "DC-035",
   "campus": "Amazon Northeast Creek Technology Campus",
   "developer_or_tenant": "Amazon",
   "segment": "Hyperscale",
   "location": "Louisa County, VA",
   "state_code": "VA",
   "state_or_province": "Virginia",
   "country": "United States",
   "metro": "Richmond",
   "grid_region": "PJM",
   "electric_utility": "Dominion Energy Virginia",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 2700,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 1296,
   "annual_gwh_expected": 8515,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 101.3,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Electricchoice also lists 'North Creek' at Mineral, VA (3 GW); same campus.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-035-amazon-northeast-creek-technology-campus/"
  },
  {
   "id": "DC-036",
   "campus": "Google Project Tembo",
   "developer_or_tenant": "Google",
   "segment": "Hyperscale",
   "location": "Cheyenne, WY",
   "state_code": "WY",
   "state_or_province": "Wyoming",
   "country": "United States",
   "metro": "Cheyenne",
   "grid_region": "West: Mountain/Northwest",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 2700,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 1296,
   "annual_gwh_expected": 8515,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 84.4,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Formerly Project Jade.",
   "source_urls": [
    "https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa",
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-036-google-project-tembo/"
  },
  {
   "id": "DC-037",
   "campus": "AWS Northern Indiana (Hobart)",
   "developer_or_tenant": "Amazon",
   "segment": "Hyperscale",
   "location": "Hobart, IN",
   "state_code": "IN",
   "state_or_province": "Indiana",
   "country": "United States",
   "metro": "Chicago",
   "grid_region": "MISO",
   "electric_utility": "NIPSCO",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 2400,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 1152,
   "annual_gwh_expected": 7569,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 90.1,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Brightlio: 2.4 GW across multiple campuses.",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/",
    "https://brightlio.com/largest-data-centers-in-us/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-037-aws-northern-indiana-hobart/"
  },
  {
   "id": "DC-038",
   "campus": "Amazon Project Rainier",
   "developer_or_tenant": "Amazon (for Anthropic)",
   "segment": "Hyperscale AI",
   "location": "New Carlisle, IN",
   "state_code": "IN",
   "state_or_province": "Indiana",
   "country": "United States",
   "metro": "South Bend",
   "grid_region": "PJM",
   "electric_utility": "Indiana Michigan Power (AEP)",
   "status": "Operating, expanding",
   "online_or_target": "2025–",
   "announced_mw": 2200,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 1188,
   "annual_gwh_expected": 7805,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 92.9,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "2.2 GW figure from 2025 press coverage; verify against primary source.",
   "source_urls": [
    "https://www.smarterlabor.com/blog/the-gigawatt-era-inside-the-5-largest-data-center-projects-in-america-in-2026"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-038-amazon-project-rainier/"
  },
  {
   "id": "DC-039",
   "campus": "Tract Hanover Technology Park",
   "developer_or_tenant": "Tract",
   "segment": "Developer campus",
   "location": "Ashland, VA",
   "state_code": "VA",
   "state_or_province": "Virginia",
   "country": "United States",
   "metro": "Richmond",
   "grid_region": "PJM",
   "electric_utility": "Dominion Energy Virginia",
   "status": "Approved",
   "online_or_target": "",
   "announced_mw": 2400,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 936,
   "annual_gwh_expected": 6150,
   "power_supply": "Grid (Dominion)",
   "gas_burn_avg_mmcfd": 73.2,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "B",
   "update_note": "Hanover supervisors rezoned the 1,200-acre park (Hickory Hill Rd) in April 2024. Status raised from Announced.",
   "research_note": "",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.electricchoice.com/datacenters/",
    "https://southernbusiness.com/?p=643272"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-039-tract-hanover-technology-park/"
  },
  {
   "id": "DC-040",
   "campus": "Adams Fork Data Center Energy Campus",
   "developer_or_tenant": "TransGas Development Systems",
   "segment": "Developer campus",
   "location": "Wharncliffe, WV",
   "state_code": "WV",
   "state_or_province": "West Virginia",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "PJM",
   "electric_utility": "On-site",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 2400,
   "mw_basis": "Generation nameplate",
   "expected_mw_2030": 173,
   "annual_gwh_expected": 1137,
   "power_supply": "On-site gas",
   "gas_burn_avg_mmcfd": 28.5,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Gas",
   "confidence": "D",
   "update_note": "",
   "research_note": "dcmap shows two Adams Fork listings (Wharncliffe and Holden, WV); treated as one.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-040-adams-fork-data-center-energy-campus/"
  },
  {
   "id": "DC-041",
   "campus": "Amp Energy East Texas",
   "developer_or_tenant": "Amp Z",
   "segment": "Developer campus",
   "location": "Lufkin, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 2100,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 189,
   "annual_gwh_expected": 1242,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 13.5,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "Region (ERCOT vs MISO/SPP) to verify.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-041-amp-energy-east-texas/"
  },
  {
   "id": "DC-042",
   "campus": "Aligned Shippingport (Bruce Mansfield)",
   "developer_or_tenant": "Aligned Data Centers",
   "segment": "Colocation",
   "location": "Shippingport, PA",
   "state_code": "PA",
   "state_or_province": "Pennsylvania",
   "country": "United States",
   "metro": "Pittsburgh",
   "grid_region": "PJM",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 2000,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 960,
   "annual_gwh_expected": 6307,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 75.1,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Estimated.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-042-aligned-shippingport-bruce-mansfield/"
  },
  {
   "id": "DC-043",
   "campus": "Microsoft Pecos Campus (Project Kilby)",
   "developer_or_tenant": "Microsoft",
   "segment": "Hyperscale",
   "location": "Pecos, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "Off-grid / on-site (Chevron PPA)",
   "status": "Approved",
   "online_or_target": "",
   "announced_mw": 2000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 780,
   "annual_gwh_expected": 5125,
   "power_supply": "On-site gas (Chevron, 20-year PPA)",
   "gas_burn_avg_mmcfd": 128.7,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Gas",
   "confidence": "B",
   "update_note": "Jul 2, 2026: 2 GW campus powered by a co-located Chevron gas plant under a 20-year PPA, off the grid at launch. Status raised from Announced; supply changed to on-site gas.",
   "research_note": "",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.electricchoice.com/datacenters/",
    "https://www.orrick.com/en/News/2026/07/Microsoft-Expands-Global-Data-Center-Capacity-with-2-GW-Data-Center-and-Co-Located-Power-Facility",
    "https://modoenergy.com/research/en/ercot-data-center-buildout-forecast-october-2026"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-043-microsoft-pecos-campus-project-kilby/"
  },
  {
   "id": "DC-044",
   "campus": "Eneus Energy Harlingen",
   "developer_or_tenant": "Eneus Energy",
   "segment": "Developer campus",
   "location": "Harlingen, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Brownsville–Harlingen",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 2000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 180,
   "annual_gwh_expected": 1183,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 12.9,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-044-eneus-energy-harlingen/"
  },
  {
   "id": "DC-045",
   "campus": "Rubix Project Ashland",
   "developer_or_tenant": "Rubix Data Centers",
   "segment": "Developer campus",
   "location": "Russell, KY",
   "state_code": "KY",
   "state_or_province": "Kentucky",
   "country": "United States",
   "metro": "Huntington–Ashland",
   "grid_region": "PJM",
   "electric_utility": "Kentucky Power (AEP)",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 2000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 180,
   "annual_gwh_expected": 1183,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 14.1,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-045-rubix-project-ashland/"
  },
  {
   "id": "DC-046",
   "campus": "Digital Realty Astra Enterprise Park",
   "developer_or_tenant": "Digital Realty",
   "segment": "Colocation",
   "location": "De Soto, KS",
   "state_code": "KS",
   "state_or_province": "Kansas",
   "country": "United States",
   "metro": "Kansas City",
   "grid_region": "SPP",
   "electric_utility": "Evergy",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 2000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 420,
   "annual_gwh_expected": 2759,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 27.4,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-046-digital-realty-astra-enterprise-park/"
  },
  {
   "id": "DC-047",
   "campus": "Tract TRIC Master-Planned Park",
   "developer_or_tenant": "Tract",
   "segment": "Developer campus",
   "location": "Sparks (Storey County), NV",
   "state_code": "NV",
   "state_or_province": "Nevada",
   "country": "United States",
   "metro": "Reno",
   "grid_region": "West: Mountain/Northwest",
   "electric_utility": "NV Energy",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 2000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 420,
   "annual_gwh_expected": 2759,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 27.4,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "Sept 2026: Nevada PUC approved 362 MW of temporary gas plants (Fleet Data Centers, a Tract affiliate) at TRIC until NV Energy service arrives in 2–3 years.",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/",
    "https://news.constructconnect.com/nevada-regulators-approve-362-mw-of-temporary-power-projects-for-data-centers"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-047-tract-tric-master-planned-park/"
  },
  {
   "id": "DC-048",
   "campus": "IREN Sweetwater",
   "developer_or_tenant": "IREN",
   "segment": "Crypto / HPC",
   "location": "Sweetwater, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 2000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 960,
   "annual_gwh_expected": 6307,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 68.8,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-048-iren-sweetwater/"
  },
  {
   "id": "DC-049",
   "campus": "Poolside Project Horizon",
   "developer_or_tenant": "Poolside AI",
   "segment": "Hyperscale AI",
   "location": "Fort Stockton, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 2000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 420,
   "annual_gwh_expected": 2759,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 30.1,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "May share the GW Ranch site (DC-024); dedup check needed.",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-049-poolside-project-horizon/"
  },
  {
   "id": "DC-050",
   "campus": "Fundamental Data Ridgeline",
   "developer_or_tenant": "Fundamental Data",
   "segment": "Developer campus",
   "location": "Hambleton, WV",
   "state_code": "WV",
   "state_or_province": "West Virginia",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "PJM",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 2000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 180,
   "annual_gwh_expected": 1183,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 14.1,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-050-fundamental-data-ridgeline/"
  },
  {
   "id": "DC-051",
   "campus": "Nscale Monarch Compute Campus",
   "developer_or_tenant": "Nscale",
   "segment": "Developer campus",
   "location": "Point Pleasant, WV",
   "state_code": "WV",
   "state_or_province": "West Virginia",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "PJM",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 2000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 960,
   "annual_gwh_expected": 6307,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 75.1,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "dcmap: 8+ GW potential campus power; 2 GW near-term figure used.",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/",
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-051-nscale-monarch-compute-campus/"
  },
  {
   "id": "DC-052",
   "campus": "Project Bunkhouse",
   "developer_or_tenant": "Taurus / Digital Realty",
   "segment": "Colocation",
   "location": "Stilesboro, GA",
   "state_code": "GA",
   "state_or_province": "Georgia",
   "country": "United States",
   "metro": "Atlanta",
   "grid_region": "Southeast utilities",
   "electric_utility": "Georgia Power",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1830,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 384,
   "annual_gwh_expected": 2523,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 37.6,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-052-project-bunkhouse/"
  },
  {
   "id": "DC-053",
   "campus": "Tract Buckeye Tech Corridor",
   "developer_or_tenant": "Tract",
   "segment": "Developer campus",
   "location": "Buckeye, AZ",
   "state_code": "AZ",
   "state_or_province": "Arizona",
   "country": "United States",
   "metro": "Phoenix",
   "grid_region": "West: Desert Southwest",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1800,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 378,
   "annual_gwh_expected": 2483,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 29.6,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-053-tract-buckeye-tech-corridor/"
  },
  {
   "id": "DC-054",
   "campus": "Joliet Technology Center",
   "developer_or_tenant": "Hillwood / PowerHouse",
   "segment": "Developer campus",
   "location": "Joliet, IL",
   "state_code": "IL",
   "state_or_province": "Illinois",
   "country": "United States",
   "metro": "Chicago",
   "grid_region": "PJM",
   "electric_utility": "ComEd",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1800,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 378,
   "annual_gwh_expected": 2483,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 29.6,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-054-joliet-technology-center/"
  },
  {
   "id": "DC-055",
   "campus": "Project Cardinal",
   "developer_or_tenant": "Pioneer Development",
   "segment": "Developer campus",
   "location": "Yorkville, IL",
   "state_code": "IL",
   "state_or_province": "Illinois",
   "country": "United States",
   "metro": "Chicago",
   "grid_region": "PJM",
   "electric_utility": "ComEd",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1800,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 378,
   "annual_gwh_expected": 2483,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 29.6,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-055-project-cardinal/"
  },
  {
   "id": "DC-056",
   "campus": "Paducah GDP AI Campus",
   "developer_or_tenant": "Brookfield / NextEra",
   "segment": "Developer campus",
   "location": "Kevil, KY",
   "state_code": "KY",
   "state_or_province": "Kentucky",
   "country": "United States",
   "metro": "Paducah",
   "grid_region": "Southeast utilities",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1800,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 378,
   "annual_gwh_expected": 2483,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 36.9,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Region/utility to verify (TVA vs MISO).",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-056-paducah-gdp-ai-campus/"
  },
  {
   "id": "DC-057",
   "campus": "PowerHouse Grand Prairie Campus",
   "developer_or_tenant": "PowerHouse Data Centers",
   "segment": "Colocation",
   "location": "Grand Prairie, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Dallas–Fort Worth",
   "grid_region": "ERCOT",
   "electric_utility": "Oncor",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 1800,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 864,
   "annual_gwh_expected": 5676,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 61.9,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-057-powerhouse-grand-prairie-campus/"
  },
  {
   "id": "DC-058",
   "campus": "Stark Hallam Hyperscale",
   "developer_or_tenant": "Stark Power",
   "segment": "Developer campus",
   "location": "Hallam, NE",
   "state_code": "NE",
   "state_or_province": "Nebraska",
   "country": "United States",
   "metro": "Lincoln",
   "grid_region": "SPP",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1700,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 357,
   "annual_gwh_expected": 2345,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 23.3,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-058-stark-hallam-hyperscale/"
  },
  {
   "id": "DC-059",
   "campus": "Galaxy Helios Campus",
   "developer_or_tenant": "Galaxy Digital",
   "segment": "Crypto / HPC",
   "location": "Afton (Dickens County), TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 1630,
   "mw_basis": "Facility / utility service",
   "expected_mw_2030": 782,
   "annual_gwh_expected": 5138,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 56.1,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "B",
   "update_note": "",
   "research_note": "1.6 GW of approved grid capacity; long-term potential up to 3.5 GW (Blackridge).",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/",
    "https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-059-galaxy-helios-campus/"
  },
  {
   "id": "DC-060",
   "campus": "Tract Silver Springs Park",
   "developer_or_tenant": "Tract",
   "segment": "Developer campus",
   "location": "Silver Springs, NV",
   "state_code": "NV",
   "state_or_province": "Nevada",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "West: Mountain/Northwest",
   "electric_utility": "NV Energy",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1600,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 336,
   "annual_gwh_expected": 2208,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 21.9,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-060-tract-silver-springs-park/"
  },
  {
   "id": "DC-061",
   "campus": "IREN SE Oklahoma Campus",
   "developer_or_tenant": "IREN",
   "segment": "Crypto / HPC",
   "location": "Clayton, OK",
   "state_code": "OK",
   "state_or_province": "Oklahoma",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "SPP",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1600,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 336,
   "annual_gwh_expected": 2208,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 21.9,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-061-iren-se-oklahoma-campus/"
  },
  {
   "id": "DC-062",
   "campus": "IREN Woods County Campus",
   "developer_or_tenant": "IREN",
   "segment": "Crypto / HPC",
   "location": "Alva, OK",
   "state_code": "OK",
   "state_or_province": "Oklahoma",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "SPP",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1600,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 336,
   "annual_gwh_expected": 2208,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 21.9,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-062-iren-woods-county-campus/"
  },
  {
   "id": "DC-063",
   "campus": "Wildcat Ridge AI Campus",
   "developer_or_tenant": "Cornell Realty Management",
   "segment": "Developer campus",
   "location": "Archbald, PA",
   "state_code": "PA",
   "state_or_province": "Pennsylvania",
   "country": "United States",
   "metro": "Scranton–Wilkes-Barre",
   "grid_region": "PJM",
   "electric_utility": "PPL",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1600,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 336,
   "annual_gwh_expected": 2208,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 26.3,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-063-wildcat-ridge-ai-campus/"
  },
  {
   "id": "DC-064",
   "campus": "Hassayampa Ranch Data Center",
   "developer_or_tenant": "Arizona Land Consulting",
   "segment": "Developer campus",
   "location": "Tonopah, AZ",
   "state_code": "AZ",
   "state_or_province": "Arizona",
   "country": "United States",
   "metro": "Phoenix",
   "grid_region": "West: Desert Southwest",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 1500,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 135,
   "annual_gwh_expected": 887,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 10.6,
   "impact_rating_1_to_4": 1,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-064-hassayampa-ranch-data-center/"
  },
  {
   "id": "DC-065",
   "campus": "AWS Project Galaxy",
   "developer_or_tenant": "Amazon",
   "segment": "Hyperscale",
   "location": "Sidney, OH",
   "state_code": "OH",
   "state_or_province": "Ohio",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "PJM",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 1500,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 720,
   "annual_gwh_expected": 4730,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 56.3,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-065-aws-project-galaxy/"
  },
  {
   "id": "DC-066",
   "campus": "Stargate Lordstown",
   "developer_or_tenant": "OpenAI / SoftBank / Oracle",
   "segment": "Hyperscale AI",
   "location": "Lordstown, OH",
   "state_code": "OH",
   "state_or_province": "Ohio",
   "country": "United States",
   "metro": "Youngstown",
   "grid_region": "PJM",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 1500,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 720,
   "annual_gwh_expected": 4730,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 56.3,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-066-stargate-lordstown/"
  },
  {
   "id": "DC-067",
   "campus": "Cloverleaf Project Open Sky",
   "developer_or_tenant": "Cloverleaf Infrastructure",
   "segment": "Developer campus",
   "location": "Piedmont, OK",
   "state_code": "OK",
   "state_or_province": "Oklahoma",
   "country": "United States",
   "metro": "Oklahoma City",
   "grid_region": "SPP",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1500,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 315,
   "annual_gwh_expected": 2070,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 20.5,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-067-cloverleaf-project-open-sky/"
  },
  {
   "id": "DC-068",
   "campus": "Core Scientific Pecos AI Campus",
   "developer_or_tenant": "Core Scientific",
   "segment": "Crypto / HPC",
   "location": "Pecos, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 1500,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 720,
   "annual_gwh_expected": 4730,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 51.6,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-068-core-scientific-pecos-ai-campus/"
  },
  {
   "id": "DC-069",
   "campus": "Crusoe Victoria AI Factory",
   "developer_or_tenant": "Crusoe",
   "segment": "Hyperscale AI",
   "location": "Victoria, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Victoria",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1500,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 315,
   "annual_gwh_expected": 2070,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 22.6,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-069-crusoe-victoria-ai-factory/"
  },
  {
   "id": "DC-070",
   "campus": "AWS Wilderness Crossing",
   "developer_or_tenant": "Amazon",
   "segment": "Hyperscale",
   "location": "Montford (Orange County), VA",
   "state_code": "VA",
   "state_or_province": "Virginia",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "PJM",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1500,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 315,
   "annual_gwh_expected": 2070,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 24.6,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "",
   "source_urls": [
    "https://www.electricchoice.com/datacenters/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-070-aws-wilderness-crossing/"
  },
  {
   "id": "DC-071",
   "campus": "Vantage Frontier (Stargate)",
   "developer_or_tenant": "Vantage Data Centers",
   "segment": "Hyperscale AI",
   "location": "Shackelford County, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "Off-grid initially",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 1400,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 672,
   "annual_gwh_expected": 4415,
   "power_supply": "Grid + on-site gas",
   "gas_burn_avg_mmcfd": 73.3,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid + gas",
   "confidence": "C",
   "update_note": "",
   "research_note": "~700 MW Voltagrid gas microgrid, off-grid initially (itk).",
   "source_urls": [
    "https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa",
    "https://itkservices3.com/background/data_centres_usa"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-071-vantage-frontier-stargate/"
  },
  {
   "id": "DC-072",
   "campus": "Stargate Michigan 'The Barn'",
   "developer_or_tenant": "Related Digital (OpenAI / Oracle)",
   "segment": "Hyperscale AI",
   "location": "Saline Township, MI",
   "state_code": "MI",
   "state_or_province": "Michigan",
   "country": "United States",
   "metro": "Ann Arbor",
   "grid_region": "MISO",
   "electric_utility": "DTE",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 1400,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 672,
   "annual_gwh_expected": 4415,
   "power_supply": "Grid (DTE)",
   "gas_burn_avg_mmcfd": 52.5,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "B",
   "update_note": "DTE signed a 1.4 GW contract, its first data center contract.",
   "research_note": "",
   "source_urls": [
    "https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa",
    "https://www.aol.com/articles/ai-driving-data-center-power-172956000.html",
    "https://www.latitudemedia.com/news/third-quarter-earnings-and-utilities-data-center-moment/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-072-stargate-michigan-the-barn/"
  },
  {
   "id": "DC-073",
   "campus": "Stargate Abilene",
   "developer_or_tenant": "Crusoe / Oracle / OpenAI",
   "segment": "Hyperscale AI",
   "location": "Abilene, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Abilene",
   "grid_region": "ERCOT",
   "electric_utility": "TBD + on-site gas",
   "status": "Operating, expanding",
   "online_or_target": "2025–",
   "announced_mw": 1200,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 648,
   "annual_gwh_expected": 4257,
   "power_supply": "Grid + on-site gas",
   "gas_burn_avg_mmcfd": 61,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "B",
   "update_note": "",
   "research_note": "First buildings online Sept 2025. 360 MW of on-site gas turbines; a major air permit was sought to add more. Reports conflict on the expansion (itk: 600 MW expansion cancelled; execgraph: 900 MW on-site plant planned).",
   "source_urls": [
    "https://www.smarterlabor.com/blog/the-gigawatt-era-inside-the-5-largest-data-center-projects-in-america-in-2026",
    "https://www.texastribune.org/2026/07/09/texas-data-centers-ai-power-plants-pollution-state-permits/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-073-stargate-abilene/"
  },
  {
   "id": "DC-074",
   "campus": "Stargate Milam County (Project Freebird)",
   "developer_or_tenant": "SB Energy",
   "segment": "Hyperscale AI",
   "location": "Burlington (Milam County), TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 1200,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 576,
   "annual_gwh_expected": 3784,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 41.3,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "On-site supply type undisclosed.",
   "source_urls": [
    "https://www.blackridgeresearch.com/blog/upcoming-largest-data-center-projects-in-united-states-usa"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-074-stargate-milam-county-project-freebird/"
  },
  {
   "id": "DC-075",
   "campus": "Stargate Project Jupiter",
   "developer_or_tenant": "STACK Infrastructure / BorderPlex Digital Assets",
   "segment": "Hyperscale AI",
   "location": "Santa Teresa (Doña Ana County), NM",
   "state_code": "NM",
   "state_or_province": "New Mexico",
   "country": "United States",
   "metro": "Las Cruces",
   "grid_region": "West: Desert Southwest",
   "electric_utility": "On-site",
   "status": "Under construction",
   "online_or_target": "2029",
   "announced_mw": 2450,
   "mw_basis": "Generation nameplate",
   "expected_mw_2030": 941,
   "annual_gwh_expected": 6182,
   "power_supply": "On-site fuel cells (Bloom, gas)",
   "gas_burn_avg_mmcfd": 114.4,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Gas",
   "confidence": "B",
   "update_note": "Jul 1, 2026: Oracle replaced gas turbines with Bloom fuel cells (over 2 GW resource); New Mexico rejected the gas pipeline.",
   "research_note": "2.45 GW on-site plant; New Mexico blocked the planned gas pipeline (Distilled).",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/",
    "https://www.distilled.earth/p/data-center-developers-want-to-build",
    "https://www.oracle.com/news/announcement/blog/weve-overhauled-project-jupiters-power-plan-2026-07-01/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-075-stargate-project-jupiter/"
  },
  {
   "id": "DC-076",
   "campus": "Meta El Paso",
   "developer_or_tenant": "Meta",
   "segment": "Hyperscale AI",
   "location": "El Paso, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "El Paso",
   "grid_region": "West: Desert Southwest",
   "electric_utility": "El Paso Electric",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 1000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 800,
   "annual_gwh_expected": 5256,
   "power_supply": "Grid + on-site gas",
   "gas_burn_avg_mmcfd": 82.9,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid + gas",
   "confidence": "C",
   "update_note": "",
   "research_note": "~366 MW on-site (Enchanted Rock) per itk.",
   "source_urls": [
    "https://www.aol.com/articles/ai-driving-data-center-power-172956000.html",
    "https://itkservices3.com/background/data_centres_usa"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-076-meta-el-paso/"
  },
  {
   "id": "DC-077",
   "campus": "Meta Lebanon",
   "developer_or_tenant": "Meta",
   "segment": "Hyperscale AI",
   "location": "Lebanon, IN",
   "state_code": "IN",
   "state_or_province": "Indiana",
   "country": "United States",
   "metro": "Indianapolis",
   "grid_region": "MISO",
   "electric_utility": "TBD",
   "status": "Under construction",
   "online_or_target": "",
   "announced_mw": 1000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 800,
   "annual_gwh_expected": 5256,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 62.5,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Broke ground early 2026; 1,500 acres.",
   "source_urls": [
    "https://www.aol.com/articles/ai-driving-data-center-power-172956000.html"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-077-meta-lebanon/"
  },
  {
   "id": "DC-078",
   "campus": "Nebius Independence",
   "developer_or_tenant": "Nebius",
   "segment": "Hyperscale AI",
   "location": "Independence, MO",
   "state_code": "MO",
   "state_or_province": "Missouri",
   "country": "United States",
   "metro": "Kansas City",
   "grid_region": "SPP",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1200,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 252,
   "annual_gwh_expected": 1656,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 16.4,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "Up to 1.2 GW on ~400 acres.",
   "source_urls": [
    "https://www.aol.com/articles/ai-driving-data-center-power-172956000.html"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-078-nebius-independence/"
  },
  {
   "id": "DC-079",
   "campus": "CloudBurst San Marcos Data Center I",
   "developer_or_tenant": "CloudBurst",
   "segment": "Developer campus",
   "location": "San Marcos, TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Austin",
   "grid_region": "ERCOT",
   "electric_utility": "TBD",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1200,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 252,
   "annual_gwh_expected": 1656,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 18.1,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "",
   "research_note": "706 acres.",
   "source_urls": [
    "https://www.aol.com/articles/ai-driving-data-center-power-172956000.html"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-079-cloudburst-san-marcos-data-center-i/"
  },
  {
   "id": "DC-080",
   "campus": "Meta Prometheus",
   "developer_or_tenant": "Meta",
   "segment": "Hyperscale AI",
   "location": "New Albany, OH",
   "state_code": "OH",
   "state_or_province": "Ohio",
   "country": "United States",
   "metro": "Columbus",
   "grid_region": "PJM",
   "electric_utility": "AEP Ohio + on-site gas",
   "status": "Operating, expanding",
   "online_or_target": "2026",
   "announced_mw": 1000,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 900,
   "annual_gwh_expected": 5913,
   "power_supply": "Grid + on-site gas",
   "gas_burn_avg_mmcfd": 82.9,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Grid + gas",
   "confidence": "B",
   "update_note": "Oct 19, 2026: Meta says the first phase is complete and live, running hundreds of thousands of GPUs.",
   "research_note": "Williams 'Socrates' behind-the-meter gas; 200 MW listed for Socrates South.",
   "source_urls": [
    "https://www.smarterlabor.com/blog/the-gigawatt-era-inside-the-5-largest-data-center-projects-in-america-in-2026",
    "https://exponentialindustry.com/ontology/datacenter-power/",
    "https://thenextweb.com/news/meta-prometheus-supercluster-1-million-gpus-muse",
    "https://www.datacenterdynamics.com/en/news/meta-details-ohio-prometheus-data-center-campus-with-first-phase-live/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-080-meta-prometheus/"
  },
  {
   "id": "DC-081",
   "campus": "Google / Tenaska SE Nebraska",
   "developer_or_tenant": "Google",
   "segment": "Hyperscale",
   "location": "Southeast Nebraska, NE",
   "state_code": "NE",
   "state_or_province": "Nebraska",
   "country": "United States",
   "metro": "Non-metro",
   "grid_region": "SPP",
   "electric_utility": "TBD",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 1000,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 150,
   "annual_gwh_expected": 986,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 9.8,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "D",
   "update_note": "",
   "research_note": "Published range 1,000–3,000 MW; low end used.",
   "source_urls": [
    "https://dcmap.us/insights/largest-data-centers/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-081-google-tenaska-se-nebraska/"
  },
  {
   "id": "DC-082",
   "campus": "Wonder Valley",
   "developer_or_tenant": "O'Leary Ventures",
   "segment": "Developer campus",
   "location": "Greenview (MD), AB",
   "state_code": "AB",
   "state_or_province": "Alberta",
   "country": "Canada",
   "metro": "Non-metro",
   "grid_region": "Alberta (AESO)",
   "electric_utility": "Off-grid / on-site",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 7500,
   "mw_basis": "Campus potential",
   "expected_mw_2030": 338,
   "annual_gwh_expected": 2221,
   "power_supply": "On-site gas",
   "gas_burn_avg_mmcfd": 55.7,
   "impact_rating_1_to_4": 3,
   "rating_driver": "Gas",
   "confidence": "C",
   "update_note": "",
   "research_note": "Announced at 7.5 GW (NGW); DC Byte cites 5.6 GW; up to 9 GW on-site generation reported.",
   "source_urls": [
    "https://www.naturalgasworld.com/vc-unveils-plan-for-7.5-gw-data-centre-in-alberta-118787",
    "https://electricalindustry.ca/?p=83345",
    "https://www.bnnbloomberg.ca/business/politics/2026/07/08/canada-data-centre-capacity-could-soar-to-20-gw-in-planned-projects-government-document/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-082-wonder-valley/"
  },
  {
   "id": "DC-083",
   "campus": "Meta Sturgeon County",
   "developer_or_tenant": "Meta",
   "segment": "Hyperscale AI",
   "location": "Sturgeon County, AB",
   "state_code": "AB",
   "state_or_province": "Alberta",
   "country": "Canada",
   "metro": "Edmonton",
   "grid_region": "Alberta (AESO)",
   "electric_utility": "AESO grid + dedicated gas plant",
   "status": "Announced",
   "online_or_target": "",
   "announced_mw": 1000,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 350,
   "annual_gwh_expected": 2300,
   "power_supply": "Dedicated gas plant ($4.6B, Pembina-led)",
   "gas_burn_avg_mmcfd": 45.6,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid + gas",
   "confidence": "C",
   "update_note": "Paired with a new generating station; Alberta gives bring-your-own-generation projects priority (June 2026).",
   "research_note": "C$13B 'gigawatt-scale' campus announced July 2026.",
   "source_urls": [
    "https://www.mondaq.com/canada/oil-gas-electricity/1846156/data-centre-west-2026-albertas-digital-infrastructure-moment-has-arrived",
    "https://www.alberta.ca/datacentres/grid",
    "https://www.bnnbloomberg.ca/business/politics/2026/07/08/canada-data-centre-capacity-could-soar-to-20-gw-in-planned-projects-government-document/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-083-meta-sturgeon-county/"
  },
  {
   "id": "DC-084",
   "campus": "TransAlta Keephills data centre",
   "developer_or_tenant": "TransAlta",
   "segment": "Developer campus",
   "location": "Keephills (Parkland County), AB",
   "state_code": "AB",
   "state_or_province": "Alberta",
   "country": "Canada",
   "metro": "Edmonton",
   "grid_region": "Alberta (AESO)",
   "electric_utility": "AESO grid",
   "status": "Approved",
   "online_or_target": "",
   "announced_mw": 230,
   "mw_basis": "Facility / utility service",
   "expected_mw_2030": 150,
   "annual_gwh_expected": 986,
   "power_supply": "Grid",
   "gas_burn_avg_mmcfd": 17.5,
   "impact_rating_1_to_4": 1,
   "rating_driver": "Grid",
   "confidence": "B",
   "update_note": "",
   "research_note": "230 MW of AESO's 1,200 MW Phase 1 large-load allocation.",
   "source_urls": [
    "https://thelogic.co/?p=2067756",
    "https://www.alberta.ca/datacentres/grid"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-084-transalta-keephills-data-centre/"
  },
  {
   "id": "DC-085",
   "campus": "Digital Realty Kokomo campus",
   "developer_or_tenant": "Digital Realty",
   "segment": "Colocation",
   "location": "Kokomo (Howard County), IN",
   "state_code": "IN",
   "state_or_province": "Indiana",
   "country": "United States",
   "metro": "Kokomo",
   "grid_region": "MISO",
   "electric_utility": "Duke Energy Indiana",
   "status": "Announced",
   "online_or_target": "2027–2033",
   "announced_mw": 1500,
   "mw_basis": "Facility power (≈1 GW IT)",
   "expected_mw_2030": 315,
   "annual_gwh_expected": 2070,
   "power_supply": "Grid (Duke Energy Indiana)",
   "gas_burn_avg_mmcfd": 24.6,
   "impact_rating_1_to_4": 2,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "New Nov 3, 2026: about 1 GW IT (1.5 GW power) on 476 acres; council opened industrial sites to data centers Sept 14, 2026; build-out to 2033.",
   "research_note": "",
   "source_urls": [
    "https://baxtel.com/news/digital-realty-picks-kokomo-for-1gw-campus-its-first-in-indiana",
    "https://www.datacenterdynamics.com/en/news/digital-realty-eyes-gigawatt-scale-data-center-site-outside-indianapolis-indiana/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-085-digital-realty-kokomo-campus/"
  },
  {
   "id": "DC-086",
   "campus": "TerraWatt Alton (former Alton Steel)",
   "developer_or_tenant": "TerraWatt",
   "segment": "Developer campus",
   "location": "Alton (Madison County), IL",
   "state_code": "IL",
   "state_or_province": "Illinois",
   "country": "United States",
   "metro": "St. Louis",
   "grid_region": "MISO",
   "electric_utility": "Ameren Illinois",
   "status": "Proposed",
   "online_or_target": "",
   "announced_mw": 200,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 30,
   "annual_gwh_expected": 197,
   "power_supply": "Not disclosed",
   "gas_burn_avg_mmcfd": 2.3,
   "impact_rating_1_to_4": 1,
   "rating_driver": "Grid",
   "confidence": "C",
   "update_note": "New Nov 3, 2026: contingent purchase of the 381-acre steel site; rezoning and an Ameren Illinois study pending.",
   "research_note": "",
   "source_urls": [
    "https://www.stlpr.org/economy-business/2026-10-21/alton-data-center-proposal",
    "https://www.datacenterdynamics.com/en/news/gigawatt-scale-data-center-proposed-for-steel-mill-in-illinois/"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-086-terrawatt-alton-former-alton-steel/"
  },
  {
   "id": "DC-087",
   "campus": "Taylor Technology Campus",
   "developer_or_tenant": "Big Watt Digital + PowerHouse Data Centers",
   "segment": "Developer campus",
   "location": "Taylor (Williamson County), TX",
   "state_code": "TX",
   "state_or_province": "Texas",
   "country": "United States",
   "metro": "Austin",
   "grid_region": "ERCOT",
   "electric_utility": "Off-grid / on-site",
   "status": "Approved",
   "online_or_target": "H1 2028",
   "announced_mw": 1000,
   "mw_basis": "Reported (unspecified)",
   "expected_mw_2030": 650,
   "annual_gwh_expected": 4270,
   "power_supply": "On-site gas (behind the meter)",
   "gas_burn_avg_mmcfd": 107.3,
   "impact_rating_1_to_4": 4,
   "rating_driver": "Gas",
   "confidence": "B",
   "update_note": "New Nov 3, 2026: Taylor council annexed the 664-acre site and approved a development agreement 5–0 on Oct 8, 2026. Off the ERCOT grid; first power H1 2028.",
   "research_note": "",
   "source_urls": [
    "https://finance.yahoo.com/technology/ai/articles/co-development-partners-big-watt-143500000.html",
    "https://www.kut.org/energy-environment/2026-10-09/taylor-tx-annex-data-center-power-plant",
    "https://baxtel.com/news/taylor-approves-1gw-gas-fired-data-center-campus-for-big-watt-powerhouse"
   ],
   "profile_url": "https://datacenterindex.info/campuses/dc-087-taylor-technology-campus/"
  }
 ]
}