Timeline · Modelled preview

How the build-out compounds

Each announcement lands on a grid and gas system that is already carrying everything before it. This timeline stacks the 87 tracked campuses year by year, so you can see the load add up to 2030.

In-service years are modelled from build stage, not reported dates. Data updated November 3, 2026; milestones now include regulatory, utility and legislative actions.

Each year stacks on the last

Every column is the total expected load running that year. Lower layers are load already online; the outlined layer at the top is what that year adds. Select a column to see which campuses arrive.

Region
Show
Layers

Against the system that exists today

The question for every utility and pipeline is not the size of one campus but the sum of all of them, measured against the capacity already in place.

United States

PJM, the largest exposure

ERCOT, where the queue is five times the peak

Alberta, where requests exceed the grid

Sources: LBNL 2024 U.S. Data Center Energy Usage Report (176 TWh in 2023, shown as average load); Enverus July 2026; PJM 2026 Long-Term Load Forecast; Government of Alberta; POWER and Gov. Abbott's Aug 3, 2026 letter (ERCOT queue and peak); Modo Energy, Oct 21, 2026 (ERCOT advanced pipeline). Tracked figures are Data Center Index estimates.

Campus by campus

The largest campuses by expected load, with the megawatts each is modelled to add per year. Black cells are load already running.

CampusStatusThru 202520262027202820292030Total MW

Dated milestones

The events behind the curve: what came online, what was announced, and the price and tariff responses that followed. These dates are reported, not modelled.

Show

    How the years are modelled

    Each campus's expected MW by 2030 (from the index) is spread across years by build stage. Totals match the index; only the timing is assumed.

    Build stageCampusesTiming of expected load

    Next pass. We will look up each campus's announcement date, groundbreaking and first energization, and replace these modelled years. Rows without a public date will keep the modelled timing and be flagged.

    See every campus behind the curve.

    The index lists all 84 campuses with their status, power supply, gas draw and impact rating.