Campus profile · DC-054

Joliet Technology Center

A developer campus by Hillwood / PowerHouse in Joliet, IL, on the PJM grid. Status: announced.

Announced1,800 MWCampus potential
Expected by 2030378 MWWeighted by build stage
Gas burn29.6 MMcf/dAverage day
Impact rating2 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 1,800 MW. After phasing to 2030 and weighting by build stage, the index expects about 378 MW running by 2030. That is about 0.2% of the PJM 2025 summer peak (160,000 MW).

At that level it would use about 2,483 GWh of electricity a year, roughly what 230,000 US homes use (EIA average of about 10,800 kWh per home), and add about 29.6 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 2 of 4 bolts. Outlined bolts mean the campus is approved, announced or proposed and may not be built as planned.

Fact sheet

Index ID
DC-054
Campus
Joliet Technology Center
Developer / tenant
Hillwood / PowerHouse
Segment
Developer campus
Location
Joliet, IL
State / province
Illinois
Country
United States
Metro
Chicago
Grid region
PJM
Electric utility
ComEd
Status
Announced (counts 35% toward 2030)
Online / target
Not disclosed
Announced capacity
1,800 MW (Campus potential)
Expected load by 2030
378 MW (index estimate)
Annual energy at expected load
about 2,483 GWh
Power supply
Not disclosed
Added gas burn, average day
29.6 MMcf/d (index estimate)
Impact rating
Grid (2 of 4; scale)
Confidence
C (One secondary source)
Last reviewed
November 3, 2026