Campus profile · DC-001

TECfusions Keystone Connect

A developer campus by TECfusions in Upper Burrell, PA, on the PJM grid. Status: operating, expanding.

Announced3,000 MWReported (unspecified)
Expected by 20301,620 MWWeighted by build stage
Gas burn126.7 MMcf/dAverage day
Impact rating4 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 3,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 1,620 MW running by 2030. That is about 1.0% of the PJM 2025 summer peak (160,000 MW).

At that level it would use about 10,643 GWh of electricity a year, roughly what 986,000 US homes use (EIA average of about 10,800 kWh per home), and add about 126.7 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 4 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Research note. Published 3,000 MW is likely campus potential; operating load is far lower. Verify before publishing.

Fact sheet

Index ID
DC-001
Campus
TECfusions Keystone Connect
Developer / tenant
TECfusions
Segment
Developer campus
Location
Upper Burrell, PA
State / province
Pennsylvania
Country
United States
Metro
Pittsburgh
Grid region
PJM
Electric utility
TBD
Status
Operating, expanding (counts 90% toward 2030)
Online / target
Not disclosed
Announced capacity
3,000 MW (Reported (unspecified))
Expected load by 2030
1,620 MW (index estimate)
Annual energy at expected load
about 10,643 GWh
Power supply
Not disclosed
Added gas burn, average day
126.7 MMcf/d (index estimate)
Impact rating
Grid (4 of 4; scale)
Confidence
D (Conflicting or estimated figures)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-001" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "TECfusions Keystone Connect" (DC-001), https://datacenterindex.info/campuses/dc-001-tecfusions-keystone-connect/, updated November 3, 2026.