Meta Prometheus
A hyperscale AI campus by Meta in New Albany, OH, on the PJM grid. Status: operating, expanding.
Grid and gas impact
At full buildout this campus is announced at 1,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 900 MW running by 2030. That is about 0.6% of the PJM 2025 summer peak (160,000 MW).
At that level it would use about 5,913 GWh of electricity a year, roughly what 548,000 US homes use (EIA average of about 10,800 kWh per home), and add about 82.9 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.
Its grid and gas scores tie: it draws on both the transmission grid and dedicated or on-site gas supply. Rated 3 of 4 bolts. Solid bolts mean the campus is operating or under construction.
Latest update. Oct 19, 2026: Meta says the first phase is complete and live, running hundreds of thousands of GPUs.
Research note. Williams 'Socrates' behind-the-meter gas; 200 MW listed for Socrates South.
Fact sheet
- Index ID
- DC-080
- Campus
- Meta Prometheus
- Developer / tenant
- Meta
- Segment
- Hyperscale AI
- Location
- New Albany, OH
- State / province
- Ohio
- Country
- United States
- Metro
- Columbus
- Grid region
- PJM
- Electric utility
- AEP Ohio + on-site gas
- Status
- Operating, expanding (counts 90% toward 2030)
- Online / target
- 2026
- Announced capacity
- 1,000 MW (Campus potential)
- Expected load by 2030
- 900 MW (index estimate)
- Annual energy at expected load
- about 5,913 GWh
- Power supply
- Grid + on-site gas
- Added gas burn, average day
- 82.9 MMcf/d (index estimate)
- Impact rating
- (3 of 4; scale)
- Confidence
- B (Several consistent sources)
- Last reviewed
- November 3, 2026
Sources
- The gigawatt era: inside the 5 largest data center projects in America in 2026Smarter Labor · 2026Secondary
- Data center power roadmapExponential Industry · 2026Secondary
- Meta details Prometheus, the Ohio supercluster heading for 1 million GPUsThe Next Web · Oct 20, 2026
- Meta details Ohio Prometheus data center campus, with first phase liveData Center Dynamics · 2026Not retrieved (site blocked automated access); confirmed via The Next Web
Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-080" in the subject.
How to cite
Data Center Index (datacenterindex.info), Discovery Energy. "Meta Prometheus" (DC-080), https://datacenterindex.info/campuses/dc-080-meta-prometheus/, updated November 3, 2026.