Campus profile · DC-038

Amazon Project Rainier

A hyperscale AI campus by Amazon (for Anthropic) in New Carlisle, IN, on the PJM grid. Status: operating, expanding.

Announced2,200 MWReported (unspecified)
Expected by 20301,188 MWWeighted by build stage
Gas burn92.9 MMcf/dAverage day
Impact rating4 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 2,200 MW. After phasing to 2030 and weighting by build stage, the index expects about 1,188 MW running by 2030. That is about 0.7% of the PJM 2025 summer peak (160,000 MW).

At that level it would use about 7,805 GWh of electricity a year, roughly what 723,000 US homes use (EIA average of about 10,800 kWh per home), and add about 92.9 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 4 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Research note. 2.2 GW figure from 2025 press coverage; verify against primary source.

Fact sheet

Index ID
DC-038
Campus
Amazon Project Rainier
Developer / tenant
Amazon (for Anthropic)
Segment
Hyperscale AI
Location
New Carlisle, IN
State / province
Indiana
Country
United States
Metro
South Bend
Grid region
PJM
Electric utility
Indiana Michigan Power (AEP)
Status
Operating, expanding (counts 90% toward 2030)
Online / target
2025–
Announced capacity
2,200 MW (Reported (unspecified))
Expected load by 2030
1,188 MW (index estimate)
Annual energy at expected load
about 7,805 GWh
Power supply
Grid
Added gas burn, average day
92.9 MMcf/d (index estimate)
Impact rating
Grid (4 of 4; scale)
Confidence
C (One secondary source)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-038" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Amazon Project Rainier" (DC-038), https://datacenterindex.info/campuses/dc-038-amazon-project-rainier/, updated November 3, 2026.