Campus profile · DC-077

Meta Lebanon

A hyperscale AI campus by Meta in Lebanon, IN, on the MISO grid. Status: under construction.

Announced1,000 MWCampus potential
Expected by 2030800 MWWeighted by build stage
Gas burn62.5 MMcf/dAverage day
Impact rating4 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 1,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 800 MW running by 2030.

At that level it would use about 5,256 GWh of electricity a year, roughly what 487,000 US homes use (EIA average of about 10,800 kWh per home), and add about 62.5 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 4 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Research note. Broke ground early 2026; 1,500 acres.

Fact sheet

Index ID
DC-077
Campus
Meta Lebanon
Developer / tenant
Meta
Segment
Hyperscale AI
Location
Lebanon, IN
State / province
Indiana
Country
United States
Metro
Indianapolis
Grid region
MISO
Electric utility
TBD
Status
Under construction (counts 80% toward 2030)
Online / target
Not disclosed
Announced capacity
1,000 MW (Campus potential)
Expected load by 2030
800 MW (index estimate)
Annual energy at expected load
about 5,256 GWh
Power supply
Not disclosed
Added gas burn, average day
62.5 MMcf/d (index estimate)
Impact rating
Grid (4 of 4; scale)
Confidence
C (One secondary source)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-077" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Meta Lebanon" (DC-077), https://datacenterindex.info/campuses/dc-077-meta-lebanon/, updated November 3, 2026.