Grid region
Data centers on the MISO grid
The Midcontinent Independent System Operator runs the grid across 15 states from Louisiana to Michigan and the Canadian province of Manitoba.
Campuses73 four-bolt, 2 three-bolt
Announced12,980 MWAt full buildout
Expected by 20304,968 MWPeak not yet calibrated
Gas burn451 MMcf/dAverage day
What is happening
- Entergy Louisiana has asked to add seven gas plants for Meta's Hyperion campus, ten in total and about 7.5 GW; the Louisiana PSC decides in December 2026 (Docket 32728).
- Entergy reports 7–12 GW of data center interest and signed gas transport for 1.325 Bcf/d to fuel 10 new combined-cycle plants.
- MISO is developing an expedited process for large-load and resource additions.
Load and gas by 2030
- Expected load by 2030
- 4,968 MW
- Grid-served
- 4,968 MW
- On-site (behind the meter)
- 0 MW
- Share of system peak
- Peak not yet calibrated
- Added gas burn
- 451 MMcf/d average day
- Gas share of new supply (assumption)
- 60% (method)
Campuses on this grid
| Campus | Location | Status | Announced MW | Expected MW 2030 | Power supply | Gas MMcf/d | Impact | Conf. |
|---|---|---|---|---|---|---|---|---|
| Meta HyperionMeta · DC-027 | Richland Parish (Holly Ridge), LA | Under construction | 5,000 | 1,200 | Grid, dedicated gas plants | 156.4 | B | |
| AWS Northern Indiana (Hobart)Amazon · DC-037 | Hobart, IN | Under construction | 2,400 | 1,152 | Grid | 90.1 | C | |
| Meta LebanonMeta · DC-077 | Lebanon, IN | Under construction | 1,000 | 800 | Not disclosed | 62.5 | C | |
| Microsoft Fairwater 1Microsoft · DC-002 | Mount Pleasant, WI | Operating, expanding | 1,480 | 799 | Grid | 62.5 | B | |
| Stargate Michigan 'The Barn'Related Digital (OpenAI / Oracle) · DC-072 | Saline Township, MI | Under construction | 1,400 | 672 | Grid (DTE) | 52.5 | B | |
| Digital Realty Kokomo campusDigital Realty · DC-085 | Kokomo (Howard County), IN | Announced | 1,500 | 315 | Grid (Duke Energy Indiana) | 24.6 | C | |
| TerraWatt Alton (former Alton Steel)TerraWatt · DC-086 | Alton (Madison County), IL | Proposed | 200 | 30 | Not disclosed | 2.3 | C |
Sources
- Louisiana regulators fast-track seven-gas-plant proposal for Meta data centerUnion of Concerned Scientists · Apr 15, 2026Advocacy
- Entergy Q3 2026 earnings call highlightsGuruFocus via Yahoo Finance · Nov 2, 2026Secondary
- Advocates cite lack of transparency, rising costs as regulators fast-track second Meta data centerWWNO · Apr 21, 2026