Grid region
Data centers on the Alaska grid
Alaska's grids are isolated from the rest of North America.
Campuses10 four-bolt, 0 three-bolt
Announced3,000 MWAt full buildout
Expected by 2030270 MWPeak not yet calibrated
Gas burn32 MMcf/dAverage day
What is happening
- One proposed North Slope campus is tracked; it has no disclosed power plan.
Load and gas by 2030
- Expected load by 2030
- 270 MW
- Grid-served
- 270 MW
- On-site (behind the meter)
- 0 MW
- Share of system peak
- Peak not yet calibrated
- Added gas burn
- 32 MMcf/d average day
- Gas share of new supply (assumption)
- 90% (method)
Campuses on this grid
| Campus | Location | Status | Announced MW | Expected MW 2030 | Power supply | Gas MMcf/d | Impact | Conf. |
|---|---|---|---|---|---|---|---|---|
| Stak Energy North SlopeStak Energy · DC-034 | North Slope, AK | Proposed | 3,000 | 270 | Not disclosed | 31.7 | D |
Sources
- U.S. data center trackerElectricchoice · accessed Oct 2026Secondary