United States · state

Data centers in Alaska

1 tracked campus of 100 MW or more in Alaska, on the Alaska grid. The largest expected load by 2030 is Stak Energy North Slope.

Campuses1100 MW or more
Announced3,000 MWAt full buildout
Expected by 2030270 MWWeighted by build stage
Gas burn32 MMcf/dAverage day

Campuses in Alaska

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Stak Energy North SlopeStak Energy · DC-034North Slope, AKAlaskaProposed3,000270Not disclosed31.7GridD

Expected load and gas burn are index estimates. See the methodology and the source log.