United States · state
Data centers in Illinois
3 tracked campuses of 100 MW or more in Illinois, on the MISO, PJM grids. The largest expected load by 2030 is Joliet Technology Center.
Campuses3100 MW or more
Announced3,800 MWAt full buildout
Expected by 2030786 MWWeighted by build stage
Gas burn62 MMcf/dAverage day
Campuses in Illinois
| Campus | Location | Grid region | Status | Announced MW | Expected MW 2030 | Power supply | Gas MMcf/d | Impact | Conf. |
|---|---|---|---|---|---|---|---|---|---|
| Joliet Technology CenterHillwood / PowerHouse · DC-054 | Joliet, IL | PJM | Announced | 1,800 | 378 | Not disclosed | 29.6 | C | |
| Project CardinalPioneer Development · DC-055 | Yorkville, IL | PJM | Announced | 1,800 | 378 | Not disclosed | 29.6 | C | |
| TerraWatt Alton (former Alton Steel)TerraWatt · DC-086 | Alton (Madison County), IL | MISO | Proposed | 200 | 30 | Not disclosed | 2.3 | C |
Expected load and gas burn are index estimates. See the methodology and the source log.