United States · state

Data centers in Wisconsin

1 tracked campus of 100 MW or more in Wisconsin, on the MISO grid. The largest expected load by 2030 is Microsoft Fairwater 1.

Campuses1100 MW or more
Announced1,480 MWAt full buildout
Expected by 2030799 MWWeighted by build stage
Gas burn62 MMcf/dAverage day

Campuses in Wisconsin

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Microsoft Fairwater 1Microsoft · DC-002Mount Pleasant, WIMISOOperating, expanding1,480799Grid62.5GridB

Expected load and gas burn are index estimates. See the methodology and the source log.