Campus profile · DC-051

Nscale Monarch Compute Campus

A developer campus by Nscale in Point Pleasant, WV, on the PJM grid. Status: under construction.

Announced2,000 MWCampus potential
Expected by 2030960 MWWeighted by build stage
Gas burn75.1 MMcf/dAverage day
Impact rating4 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 2,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 960 MW running by 2030. That is about 0.6% of the PJM 2025 summer peak (160,000 MW).

At that level it would use about 6,307 GWh of electricity a year, roughly what 584,000 US homes use (EIA average of about 10,800 kWh per home), and add about 75.1 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 4 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Research note. dcmap: 8+ GW potential campus power; 2 GW near-term figure used.

Fact sheet

Index ID
DC-051
Campus
Nscale Monarch Compute Campus
Developer / tenant
Nscale
Segment
Developer campus
Location
Point Pleasant, WV
State / province
West Virginia
Country
United States
Metro
Non-metro
Grid region
PJM
Electric utility
TBD
Status
Under construction (counts 80% toward 2030)
Online / target
Not disclosed
Announced capacity
2,000 MW (Campus potential)
Expected load by 2030
960 MW (index estimate)
Annual energy at expected load
about 6,307 GWh
Power supply
Not disclosed
Added gas burn, average day
75.1 MMcf/d (index estimate)
Impact rating
Grid (4 of 4; scale)
Confidence
C (One secondary source)
Last reviewed
November 3, 2026