Atlas Power Williston
A crypto-mining / HPC campus by Atlas Power in Williston, ND, on the SPP grid. Status: operating.
Grid and gas impact
At full buildout this campus is announced at 700 MW. After phasing to 2030 and weighting by build stage, the index expects about 700 MW running by 2030. That is about 1.2% of the SPP 2025 peak (56,000 MW).
At that level it would use about 4,599 GWh of electricity a year, roughly what 426,000 US homes use (EIA average of about 10,800 kWh per home), and add about 45.6 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.
Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 3 of 4 bolts. Solid bolts mean the campus is operating or under construction.
Research note. Region (SPP vs MISO) to verify.
Fact sheet
- Index ID
- DC-007
- Campus
- Atlas Power Williston
- Developer / tenant
- Atlas Power
- Segment
- Crypto / HPC
- Location
- Williston, ND
- State / province
- North Dakota
- Country
- United States
- Metro
- Non-metro
- Grid region
- SPP
- Electric utility
- TBD
- Status
- Operating (counts 100% toward 2030)
- Online / target
- Not disclosed
- Announced capacity
- 700 MW (Reported (unspecified))
- Expected load by 2030
- 700 MW (index estimate)
- Annual energy at expected load
- about 4,599 GWh
- Power supply
- Grid
- Added gas burn, average day
- 45.6 MMcf/d (index estimate)
- Impact rating
- (3 of 4; scale)
- Confidence
- C (One secondary source)
- Last reviewed
- November 3, 2026
Sources
- Largest US data centers by reported powerdcmap.us · accessed Oct 2026Secondary
Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-007" in the subject.
How to cite
Data Center Index (datacenterindex.info), Discovery Energy. "Atlas Power Williston" (DC-007), https://datacenterindex.info/campuses/dc-007-atlas-power-williston/, updated November 3, 2026.