United States · state

Data centers in North Dakota

1 tracked campus of 100 MW or more in North Dakota, on the SPP grid. The largest expected load by 2030 is Atlas Power Williston.

Campuses1100 MW or more
Announced700 MWAt full buildout
Expected by 2030700 MWWeighted by build stage
Gas burn46 MMcf/dAverage day

Campuses in North Dakota

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Atlas Power WillistonAtlas Power · DC-007Williston, NDSPPOperating700700Grid45.6GridC

Expected load and gas burn are index estimates. See the methodology and the source log.