Campus profile · DC-019

Fermi America Project Matador (HyperGrid)

A developer campus by Fermi America in Amarillo (Carson County), TX, on the SPP grid. Status: under construction.

Announced11,000 MWCampus potential
Expected by 20302,640 MWWeighted by build stage
Gas burn435.8 MMcf/dAverage day
Impact rating4 of 4Gas driven

Grid and gas impact

At full buildout this campus is announced at 11,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 2,640 MW running by 2030. That is about 4.7% of the SPP 2025 peak (56,000 MW).

At that level it would use about 17,345 GWh of electricity a year, roughly what 1,607,000 US homes use (EIA average of about 10,800 kWh per home), and add about 435.8 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by gas: most or all of its power comes from on-site or dedicated gas generation, so the strain falls on pipelines and local gas supply rather than the transmission grid. Rated 4 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Latest update. TensorWave signed a binding 222 MW, $6.5B lease (Aug 2026); closing extended to Oct 31, 2026 pending a guaranty. First tenant had exited in Dec 2025.

Research note. dcmap cites 17,000 MW; Blackridge/Brightlio up to 11 GW; Electricchoice lists Phase 1 at a 2 GW target. Gas plus planned nuclear.

Fact sheet

Index ID
DC-019
Campus
Fermi America Project Matador (HyperGrid)
Developer / tenant
Fermi America
Segment
Developer campus
Location
Amarillo (Carson County), TX
State / province
Texas
Country
United States
Metro
Amarillo
Grid region
SPP
Electric utility
Off-grid / on-site
Status
Under construction (counts 80% toward 2030)
Online / target
Not disclosed
Announced capacity
11,000 MW (Campus potential)
Expected load by 2030
2,640 MW (index estimate)
Annual energy at expected load
about 17,345 GWh
Power supply
On-site gas
Added gas burn, average day
435.8 MMcf/d (index estimate)
Impact rating
Gas (4 of 4; scale)
Confidence
D (Conflicting or estimated figures)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-019" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Fermi America Project Matador (HyperGrid)" (DC-019), https://datacenterindex.info/campuses/dc-019-fermi-america-project-matador-hypergrid/, updated November 3, 2026.