Campus profile · DC-043

Microsoft Pecos Campus (Project Kilby)

A hyperscale campus by Microsoft in Pecos, TX, on the ERCOT grid. Status: approved.

Announced2,000 MWCampus potential
Expected by 2030780 MWWeighted by build stage
Gas burn128.7 MMcf/dAverage day
Impact rating4 of 4Gas driven

Grid and gas impact

At full buildout this campus is announced at 2,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 780 MW running by 2030. That is about 0.9% of the ERCOT record peak of July 22, 2026 (91,089 MW).

At that level it would use about 5,125 GWh of electricity a year, roughly what 475,000 US homes use (EIA average of about 10,800 kWh per home), and add about 128.7 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by gas: most or all of its power comes from on-site or dedicated gas generation, so the strain falls on pipelines and local gas supply rather than the transmission grid. Rated 4 of 4 bolts. Outlined bolts mean the campus is approved, announced or proposed and may not be built as planned.

Latest update. Jul 2, 2026: 2 GW campus powered by a co-located Chevron gas plant under a 20-year PPA, off the grid at launch. Status raised from Announced; supply changed to on-site gas.

Fact sheet

Index ID
DC-043
Campus
Microsoft Pecos Campus (Project Kilby)
Developer / tenant
Microsoft
Segment
Hyperscale
Location
Pecos, TX
State / province
Texas
Country
United States
Metro
Non-metro
Grid region
ERCOT
Electric utility
Off-grid / on-site (Chevron PPA)
Status
Approved (counts 65% toward 2030)
Online / target
Not disclosed
Announced capacity
2,000 MW (Campus potential)
Expected load by 2030
780 MW (index estimate)
Annual energy at expected load
about 5,125 GWh
Power supply
On-site gas (Chevron, 20-year PPA)
Added gas burn, average day
128.7 MMcf/d (index estimate)
Impact rating
Gas (4 of 4; scale)
Confidence
B (Several consistent sources)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-043" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Microsoft Pecos Campus (Project Kilby)" (DC-043), https://datacenterindex.info/campuses/dc-043-microsoft-pecos-campus-project-kilby/, updated November 3, 2026.