Meta El Paso
A hyperscale AI campus by Meta in El Paso, TX, on the West: Desert Southwest grid. Status: under construction.
Grid and gas impact
At full buildout this campus is announced at 1,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 800 MW running by 2030.
At that level it would use about 5,256 GWh of electricity a year, roughly what 487,000 US homes use (EIA average of about 10,800 kWh per home), and add about 82.9 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.
Its grid and gas scores tie: it draws on both the transmission grid and dedicated or on-site gas supply. Rated 3 of 4 bolts. Solid bolts mean the campus is operating or under construction.
Research note. ~366 MW on-site (Enchanted Rock) per itk.
Fact sheet
- Index ID
- DC-076
- Campus
- Meta El Paso
- Developer / tenant
- Meta
- Segment
- Hyperscale AI
- Location
- El Paso, TX
- State / province
- Texas
- Country
- United States
- Metro
- El Paso
- Grid region
- West: Desert Southwest
- Electric utility
- El Paso Electric
- Status
- Under construction (counts 80% toward 2030)
- Online / target
- Not disclosed
- Announced capacity
- 1,000 MW (Campus potential)
- Expected load by 2030
- 800 MW (index estimate)
- Annual energy at expected load
- about 5,256 GWh
- Power supply
- Grid + on-site gas
- Added gas burn, average day
- 82.9 MMcf/d (index estimate)
- Impact rating
- (3 of 4; scale)
- Confidence
- C (One secondary source)
- Last reviewed
- November 3, 2026
Sources
- AI is driving data center power demandBusiness Insider via AOL · 2026
- US data centres: power sourcesitk · 2026Secondary
Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-076" in the subject.
How to cite
Data Center Index (datacenterindex.info), Discovery Energy. "Meta El Paso" (DC-076), https://datacenterindex.info/campuses/dc-076-meta-el-paso/, updated November 3, 2026.