Stargate Project Jupiter
A hyperscale AI campus by STACK Infrastructure / BorderPlex Digital Assets in Santa Teresa (Doña Ana County), NM, on the West: Desert Southwest grid. Status: under construction.
Grid and gas impact
At full buildout this campus is announced at 2,450 MW. After phasing to 2030 and weighting by build stage, the index expects about 941 MW running by 2030.
At that level it would use about 6,182 GWh of electricity a year, roughly what 573,000 US homes use (EIA average of about 10,800 kWh per home), and add about 114.4 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.
Its rating is driven by gas: most or all of its power comes from on-site or dedicated gas generation, so the strain falls on pipelines and local gas supply rather than the transmission grid. Rated 4 of 4 bolts. Solid bolts mean the campus is operating or under construction.
Latest update. Jul 1, 2026: Oracle replaced gas turbines with Bloom fuel cells (over 2 GW resource); New Mexico rejected the gas pipeline.
Research note. 2.45 GW on-site plant; New Mexico blocked the planned gas pipeline (Distilled).
Fact sheet
- Index ID
- DC-075
- Campus
- Stargate Project Jupiter
- Developer / tenant
- STACK Infrastructure / BorderPlex Digital Assets
- Segment
- Hyperscale AI
- Location
- Santa Teresa (Doña Ana County), NM
- State / province
- New Mexico
- Country
- United States
- Metro
- Las Cruces
- Grid region
- West: Desert Southwest
- Electric utility
- On-site
- Status
- Under construction (counts 80% toward 2030)
- Online / target
- 2029
- Announced capacity
- 2,450 MW (Generation nameplate)
- Expected load by 2030
- 941 MW (index estimate)
- Annual energy at expected load
- about 6,182 GWh
- Power supply
- On-site fuel cells (Bloom, gas)
- Added gas burn, average day
- 114.4 MMcf/d (index estimate)
- Impact rating
- (4 of 4; scale)
- Confidence
- B (Several consistent sources)
- Last reviewed
- November 3, 2026
Sources
- Largest US data centers by reported powerdcmap.us · accessed Oct 2026Secondary
- Data center developers want to build behind the meterDistilled · 2026
- We've overhauled Project Jupiter's power planOracle · Jul 1, 2026Company statement
Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-075" in the subject.
How to cite
Data Center Index (datacenterindex.info), Discovery Energy. "Stargate Project Jupiter" (DC-075), https://datacenterindex.info/campuses/dc-075-stargate-project-jupiter/, updated November 3, 2026.