A developer campus by Big Watt Digital + PowerHouse Data Centers in Taylor (Williamson County), TX, on the ERCOT grid. Status: approved.

Announced1,000 MWReported (unspecified)
Expected by 2030650 MWWeighted by build stage
Gas burn107.3 MMcf/dAverage day
Impact rating4 of 4Gas driven

Grid and gas impact

At full buildout this campus is announced at 1,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 650 MW running by 2030. That is about 0.7% of the ERCOT record peak of July 22, 2026 (91,089 MW).

At that level it would use about 4,270 GWh of electricity a year, roughly what 396,000 US homes use (EIA average of about 10,800 kWh per home), and add about 107.3 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by gas: most or all of its power comes from on-site or dedicated gas generation, so the strain falls on pipelines and local gas supply rather than the transmission grid. Rated 4 of 4 bolts. Outlined bolts mean the campus is approved, announced or proposed and may not be built as planned.

Latest update. New Nov 3, 2026: Taylor council annexed the 664-acre site and approved a development agreement 5–0 on Oct 8, 2026. Off the ERCOT grid; first power H1 2028.

Fact sheet

Index ID
DC-087
Campus
Taylor Technology Campus
Developer / tenant
Big Watt Digital + PowerHouse Data Centers
Segment
Developer campus
Location
Taylor (Williamson County), TX
State / province
Texas
Country
United States
Metro
Austin
Grid region
ERCOT
Electric utility
Off-grid / on-site
Status
Approved (counts 65% toward 2030)
Online / target
H1 2028
Announced capacity
1,000 MW (Reported (unspecified))
Expected load by 2030
650 MW (index estimate)
Annual energy at expected load
about 4,270 GWh
Power supply
On-site gas (behind the meter)
Added gas burn, average day
107.3 MMcf/d (index estimate)
Impact rating
Gas (4 of 4; scale)
Confidence
B (Several consistent sources)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-087" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Taylor Technology Campus" (DC-087), https://datacenterindex.info/campuses/dc-087-taylor-technology-campus/, updated November 3, 2026.