A colocation campus by Compass Datacenters in Red Oak, TX, on the ERCOT grid. Status: operating, expanding.

Announced360 MWReported (unspecified)
Expected by 2030324 MWWeighted by build stage
Gas burn23.2 MMcf/dAverage day
Impact rating2 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 360 MW. After phasing to 2030 and weighting by build stage, the index expects about 324 MW running by 2030. That is about 0.4% of the ERCOT record peak of July 22, 2026 (91,089 MW).

At that level it would use about 2,129 GWh of electricity a year, roughly what 197,000 US homes use (EIA average of about 10,800 kWh per home), and add about 23.2 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 2 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Fact sheet

Index ID
DC-017
Campus
Compass Red Oak DFW III
Developer / tenant
Compass Datacenters
Segment
Colocation
Location
Red Oak, TX
State / province
Texas
Country
United States
Metro
Dallas–Fort Worth
Grid region
ERCOT
Electric utility
Oncor
Status
Operating, expanding (counts 90% toward 2030)
Online / target
Not disclosed
Announced capacity
360 MW (Reported (unspecified))
Expected load by 2030
324 MW (index estimate)
Annual energy at expected load
about 2,129 GWh
Power supply
Grid
Added gas burn, average day
23.2 MMcf/d (index estimate)
Impact rating
Grid (2 of 4; scale)
Confidence
C (One secondary source)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-017" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Compass Red Oak DFW III" (DC-017), https://datacenterindex.info/campuses/dc-017-compass-red-oak-dfw-iii/, updated November 3, 2026.