Canada · province
Data centers in Alberta
3 tracked campuses of 100 MW or more in Alberta, on the Alberta (AESO) grid. The largest expected load by 2030 is Meta Sturgeon County.
Campuses3100 MW or more
Announced8,730 MWAt full buildout
Expected by 2030838 MWWeighted by build stage
Gas burn119 MMcf/dAverage day
Campuses in Alberta
| Campus | Location | Grid region | Status | Announced MW | Expected MW 2030 | Power supply | Gas MMcf/d | Impact | Conf. |
|---|---|---|---|---|---|---|---|---|---|
| Meta Sturgeon CountyMeta · DC-083 | Sturgeon County, AB | Alberta (AESO) | Announced | 1,000 | 350 | Dedicated gas plant ($4.6B, Pembina-led) | 45.6 | C | |
| Wonder ValleyO'Leary Ventures · DC-082 | Greenview (MD), AB | Alberta (AESO) | Proposed | 7,500 | 338 | On-site gas | 55.7 | C | |
| TransAlta Keephills data centreTransAlta · DC-084 | Keephills (Parkland County), AB | Alberta (AESO) | Approved | 230 | 150 | Grid | 17.5 | B |
Expected load and gas burn are index estimates. See the methodology and the source log.