Canada · province

Data centers in Alberta

3 tracked campuses of 100 MW or more in Alberta, on the Alberta (AESO) grid. The largest expected load by 2030 is Meta Sturgeon County.

Campuses3100 MW or more
Announced8,730 MWAt full buildout
Expected by 2030838 MWWeighted by build stage
Gas burn119 MMcf/dAverage day

Campuses in Alberta

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Meta Sturgeon CountyMeta · DC-083Sturgeon County, ABAlberta (AESO)Announced1,000350Dedicated gas plant ($4.6B, Pembina-led)45.6Grid + gasC
Wonder ValleyO'Leary Ventures · DC-082Greenview (MD), ABAlberta (AESO)Proposed7,500338On-site gas55.7GasC
TransAlta Keephills data centreTransAlta · DC-084Keephills (Parkland County), ABAlberta (AESO)Approved230150Grid17.5GridB

Expected load and gas burn are index estimates. See the methodology and the source log.