Campus profile · DC-056

Paducah GDP AI Campus

A developer campus by Brookfield / NextEra in Kevil, KY, on the Southeast utilities grid. Status: announced.

Announced1,800 MWCampus potential
Expected by 2030378 MWWeighted by build stage
Gas burn36.9 MMcf/dAverage day
Impact rating2 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 1,800 MW. After phasing to 2030 and weighting by build stage, the index expects about 378 MW running by 2030.

At that level it would use about 2,483 GWh of electricity a year, roughly what 230,000 US homes use (EIA average of about 10,800 kWh per home), and add about 36.9 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 2 of 4 bolts. Outlined bolts mean the campus is approved, announced or proposed and may not be built as planned.

Research note. Region/utility to verify (TVA vs MISO).

Fact sheet

Index ID
DC-056
Campus
Paducah GDP AI Campus
Developer / tenant
Brookfield / NextEra
Segment
Developer campus
Location
Kevil, KY
State / province
Kentucky
Country
United States
Metro
Paducah
Grid region
Southeast utilities
Electric utility
TBD
Status
Announced (counts 35% toward 2030)
Online / target
Not disclosed
Announced capacity
1,800 MW (Campus potential)
Expected load by 2030
378 MW (index estimate)
Annual energy at expected load
about 2,483 GWh
Power supply
Not disclosed
Added gas burn, average day
36.9 MMcf/d (index estimate)
Impact rating
Grid (2 of 4; scale)
Confidence
C (One secondary source)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-056" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Paducah GDP AI Campus" (DC-056), https://datacenterindex.info/campuses/dc-056-paducah-gdp-ai-campus/, updated November 3, 2026.