Campus profile · DC-068

Core Scientific Pecos AI Campus

A crypto-mining / HPC campus by Core Scientific in Pecos, TX, on the ERCOT grid. Status: under construction.

Announced1,500 MWCampus potential
Expected by 2030720 MWWeighted by build stage
Gas burn51.6 MMcf/dAverage day
Impact rating3 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 1,500 MW. After phasing to 2030 and weighting by build stage, the index expects about 720 MW running by 2030. That is about 0.8% of the ERCOT record peak of July 22, 2026 (91,089 MW).

At that level it would use about 4,730 GWh of electricity a year, roughly what 438,000 US homes use (EIA average of about 10,800 kWh per home), and add about 51.6 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 3 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Fact sheet

Index ID
DC-068
Campus
Core Scientific Pecos AI Campus
Developer / tenant
Core Scientific
Segment
Crypto / HPC
Location
Pecos, TX
State / province
Texas
Country
United States
Metro
Non-metro
Grid region
ERCOT
Electric utility
TBD
Status
Under construction (counts 80% toward 2030)
Online / target
Not disclosed
Announced capacity
1,500 MW (Campus potential)
Expected load by 2030
720 MW (index estimate)
Annual energy at expected load
about 4,730 GWh
Power supply
Not disclosed
Added gas burn, average day
51.6 MMcf/d (index estimate)
Impact rating
Grid (3 of 4; scale)
Confidence
C (One secondary source)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email info@deaudits.com with "Correction: DC-068" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Core Scientific Pecos AI Campus" (DC-068), https://datacenterindex.info/campuses/dc-068-core-scientific-pecos-ai-campus/, updated November 3, 2026.